My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:39 AM
Creation date
1/13/2023 9:15:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EHD Received via CERS submittal: <br /> Underground Storage Tank 1/28/2023 <br /> Monitoring System Certification Form <br /> 5. MONITORING SYSTEM AND PROGRAMMING <br /> A separate Monitoring System Certification Form must be prepared for each control panel <br /> Make of Monitoring System Model of Monitoring System Software Version Installed <br /> Control Panel Control Panel <br /> Veeder Root TLS-350 329.01 <br /> Attach the post-certification reports if the monitoring system is capable of generating .Yes No NA <br /> either, OlMonitoring System Set-up 0 Alarm History Report <br /> All monitoring equipment is operational per manufacturer's specifications? 21 Ll <br /> Secondary containment systems are free of damage, debris, or liquid? 21 J <br /> Are the audible and visual alarms operational? A g <br /> All sensors have been: 1) visually inspected for wiring kinks, breaks and residual <br /> buildup on floats, and 2) tested for functionality and confirmed operational? <br /> Are all sensors installed to detect a release at the earliest opportunity in the 0 J L) <br /> secondary containment? <br /> The monitoring system set-up was reviewed, and proper settings confirmed? <br /> Was the monitoring control panel's backup battery visually inspected, functionally 0 Lj L) <br /> tested; and confirmed operational? <br /> Does the flow of fuel stop at the dispenser if a release is detected in the under- 0 J L) <br /> dispenser containment? <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system fails to operate or is electrically disconnected? <br /> Does the turbine automatically shut dawn if the piping secondary containment <br /> monitoring system detects a release? Which sensors initiate positive shut down? A Ll Ll <br /> (Check all that apply) Z Sump 0 UDC <br /> If monitoring system alarms are relayed to a remote monitoring center, is all R) Ll Ll <br /> communication equipment operational? <br /> Describe alf answers marked `'No"or`Fail'acrd proposed remedy in Sec rion 9. <br /> List all monitoring equipment either replaced or repaired in Section g <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.