Laserfiche WebLink
We didn't know we needed one and had our client pressuring us to perform the work while <br /> we were trying to do our due diligence.Approved to pay any additional fees. Moving forward <br /> we will be pulling permits for drop tube replacements prior to any work performed. <br /> If you have any questions, email me or give me a call at 909-543-8904. <br /> Bruno Espinoza <br /> CD ]ONES COVEY GROUP,INC. <br /> 9595 Lucas Ranch Road #100 <br /> Rancho Cucamonga, CA 91730 <br /> (888) 972-7581 Office <br /> bespinoza@JonesCovey.com <br /> This e-mail and any files transmitted with it are the property of Jones Covey Group, Inc are <br /> confidential, and are intended solely for the use of the individual or entity to whom this e-mail <br /> is addressed. <br /> From: Rivera, Stacy [EHD] <srivera@segov.org> <br /> Sent: Wednesday, November 2, 2022 8:07 AM <br /> To: Bruno Espinoza <bespinoza@lonescovey.com> <br /> Cc: Rob Sills<rsills@lonescovey.com>; Henry, Michelle D [EHD] <mhenry@slgov.org>; Manzo, Elena K. <br /> [EHD] <emanzo@slgov.org>; environmentalcompliance@costco.com; Presto, Carol [EHD] <br /> <cpresto@slgov.org>; Ernest, Frederick [EHD] <fernest@slgov.org> <br /> Subject: RE: Plan Check- 3250 W Grantline Rd,Tracy CA 95304-Costco 658 Tracy-2256713-1 -As-Built <br /> Drop Tube Replacement <br /> Good morning, <br /> Thank you for taking the time for a phone call this morning. Per our conversation... <br /> I've received the permit for replacement of the 87B tank drop tube. According to the application,the <br /> replacement took place on 10/10/22. The work order included with the application indicates an order <br /> date of 9/30/22 and a replacement date of 10/10/22 by Jones Covey. Below are the items we discussed: <br /> 1. Replacement of overfill prevention equipment requires a permit be obtained and approved by <br /> EHD prior to work being conducted. Since the work has already been completed, a Failure to <br /> Obtain a Permit penalty applies (an additional $468). The permit application cannot be <br /> processed until all fees have been submitted. <br /> 2. The overfill was tested on 8/30/22 with an EHD inspector present. The work order indicates a <br /> replacement was ordered on or before 9/30/22 and states "T2 has an overfill flapper that is <br /> faulty". How was it determined that the flapper was faulty? <br /> 3. The work order lists an Order Quantity of"2 each". Were two overfill drop tubes replaced? <br />