My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:44:35 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<� Job Order Trip Field <br /> 2254140-1-2 <br /> Jones Covey Group, Inc. <br /> 9595 Lucas Ranch Rd. Posted <br /> Rancho Cucamonga,CA 91730 <br /> 888-972-7581 <br /> I IIII II IIIIIII II III <br /> 2254140-1 <br /> Account BillTo <br /> Costco 658 Tracy Jones Covey Group Trip Date 8/26/22 <br /> 3250 W Grantline Rd. 9595 Lucas Ranch Rd. PO# GC21030 <br /> Tracy, CA 95304 Rancho Cucamonga, CA 91730 Tech Name Shawn P Rodriguez <br /> Job Details <br /> Description: <br /> ............................................................................................................................................................................................................................................................................................................................................................................................ <br /> 08/25 - Beto Drive Day -Take the calibration trailer and purge hoses. <br /> Onsite 08/26 - 08/30 please be onsite at 7am 08/26 <br /> Purge/Calibrate <br /> Test the Line & Leak Detector <br /> Assist GC with any other items needed <br /> 09/01 beto drive home <br /> ............................................................................................................................................................................................................................................................................................................................................................................................ <br /> Completion Notes: <br /> 8/26/22 Shawn/Alberto: <br /> Arrived on site and checked in with Austin Downey Project Manager and Roberto Benito from construction. While on site <br /> today we installed new Franklin Fueling drop tubes for all tanks. Drop tubes were installed at or below 95%tank capacity. At <br /> this time the new premium tank did not have fuel and the vapor recover piping was not plumbed in. Because of these reason <br /> a drop tube and leak decay testing was not performed. We also assisted construction by installing two FE Petro Turbin motors <br /> for new 91 tank, connected product and vapor return piping for 91 lines, and assisted with tracking down leaks from ELD <br /> testing. By end of day the 91 Tank did not have fuel, 91 turbines still needed to be wired, all dispensers did not have power, <br /> and vapor recovery line was still not plumbed in. Construction did not have keys for old dispensers so we could not access the <br /> upper cabinet. <br /> Product Description Order Quantity Order <br /> Uom <br /> Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.