My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:44:35 PM
Creation date
1/13/2023 9:39:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518288
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3250 W GRANT LINE RD TRACY 95377
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7= 51 <br /> IS[ 57 <br /> as ss P.n <br /> i•v <br /> Ji. lug <br /> NOTE: When secondary, "positive," shut-off is set at 95% of tank volume, the level at which <br /> primary shut-off occurs varies with tank volume. The above illustration depicts how tank volume <br /> could influence the actual shut-off levels of a mechanical OPV. <br /> FINAL SHUTOFF <br /> 99.0% ir__ ____-__ ____' __ ____V__ ____ 1 <br /> ____�__ _ <br /> 1 1 1 1 ' T- 1 Y- 1 INSTALLED 09896 <br /> 9741% ' 1 1 1 1 PRIMARY SHUTOFF <br /> I 1 1 1 1 1 WITH FINAL <br /> INSTALED @98% <br /> 1 1 I L FINAL.SHUTOFF <br /> 95.9% <br /> INSTALLED @951A <br /> sa-oIl 4 I 1 Z <br /> PRIMAR SHUTOFF <br /> W FTH FINAL <br /> INSTALED 095% <br /> � � r <br /> ASSVMPTIONS: <br /> B9-O% <br /> -G E NERIC CYLIN DRI CAL <br /> TANK WITH FLAT ENDS <br /> a'o% -PRIMARY SHUTOFF <br /> POI NT IS A <br /> 87AIi CALCULATE D OFFSET <br /> (5"1 FROM FINAL <br /> SHUTOFF SETPOINT, <br /> — USING GASOLINE WITH <br /> X5,0% A SPECIFIC GRAVFTY OF <br /> M75 <br /> 9+A% <br /> 19 <br /> TANK DIAMETER(FEET I <br /> NOTE: The installation height of an OPV can be adjusted to optimize actual shut-off levels as <br /> required. Consult local regulations for specific requirements in your area. The above graph <br /> shows how a two-stage, mechanical overfill prevention device is influenced by tank diameter and <br /> volume. <br /> a� <br /> 4 %. <br />
The URL can be used to link to this page
Your browser does not support the video tag.