Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for ONE STOP MARKET* as of March 15, 2023. <br /> Open violations from December 08, 2022 inspection <br /> Violation#115-Failure to submit"Monitoring System Certification Form"within 30 days of completion of <br /> the test. <br /> OBSERVATION:Annual monitoring system certification and leak detector testing was performed on 12/15/2021 and <br /> a test report was submitted on 4/11/2022, 87 days late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#116-Failure to submit the"Spill Container Testing Report Form"within 30 days. <br /> OBSERVATION:Annual spill container testing was performed on 12/15/2021 and a test report was submitted on <br /> 4/11/2022, 87 days late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#118-Failure to submit the"Overfill Prevention Equipment Inspection Report Form"within 30 <br /> days. <br /> OBSERVATION:An overfill prevention equipment inspection was performed on 12/15/2021 and a test report was <br /> submitted on 4/11/2022, 87 days late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> Page 1 of 3 <br />