Laserfiche WebLink
Underground Storage Tank <br /> Designated UST Operator-Visual Inspection Report <br /> 10. TESTING AND MAINTENANCE Yes No NA Cate last <br /> performed <br /> Has monitoring system certification been completed within the past <br /> 12 months? 12!8/22 <br /> Has spill container testing been completed within the past <br /> 12 months? 12/8/22 <br /> Has overfill iprevention equipment inspection been completed within Q <br /> the past 36 months? ❑ © 12/15/21 <br /> Has secondary containment testing been completed within the past 0 ❑ <br /> 36 months? 1/21/20 <br /> Has tank tightness testing been completed within required 0 <br /> timeframes? \ ✓ <br /> Has line tightness testing been completed within the re fired 0 <br /> timeframes? <br /> Other Test/ Maintenance: 0 ❑ ff r <br /> Other Test/ Maintenance: <br /> Other Test/ Maintenance: ❑ Q F❑ <br /> 11. FACILITY EMPLOYEE TRAINING Yes No <br /> Have all individuals performing facility employee duties received the required facility [] ❑ � <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section ,may be used to record comments or observations that are not current compliance <br /> deficiencies. r <br /> Tank and line tightness test is not required for double wall tank and line <br /> 4 <br /> di <br /> i <br /> All answers marked "No"must be described by the designated UST operator in Section 3. <br /> Page 4 of 4 <br /> I <br /> W <br />