Laserfiche WebLink
SAN J 0 A Q I I I Irl Environmental Health Department <br /> CCUNr <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> SHERIFFS OPERATIONS CTR#1 T7000 N MICHAEL CANLIS RD, FRENCH CAMP January 13, 2023 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 310 CCR 2636(f)(4) Failure to meet monitoring requirements in lieu of being tightness tested every 12 months. <br /> OBSERVATION: The 87 UDC sensor does not cause shutdown and does not meet the requirements for annual line <br /> tightness testing exemption. <br /> REGULATION GUIDANCE:All pressurized piping with secondary containment shall be pressure tested at least <br /> once every 12 months at a minimum release detection of 0.1 gallons per hour at 150 percent of the normal <br /> operating pressure. Continuous monitoring systems that are fail safe and shut down the pump when a leak is <br /> detected, or optionally stop the flow of product at the dispenser if the leak is in the under dispenser containment <br /> (UDC), shall satisfy the requirement for annual line tightness testing. <br /> CORRECTIVE ACTION: Immediately schedule an annual line tightness test and provide 48 hours notification to the <br /> EHD. <br /> This is a Class II violation. <br /> Overall Inspection Comments: <br /> An inspection checklist was provided to the facility operator on the day of inspection. A complete report was <br /> finished on 1/31/2023 and replaces the initial checklist. <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, within 30 days of receiving the complete inspection report. <br /> NOTE: The CFO letter in CERS is dated 1/14/2022. Please upload an updated CFO letter to CERS by <br /> 1/14/2023. <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING <br /> THIS FACILITY BACK INTO COMPLIANCE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Date: January 31, 2023 Inspector: Inspector Phone: <br /> Printed Name and Title: GABRIELA GARCIA-MEJIA, EH Specialist (209)616-3037 <br /> Emailed to David Myers, Environmental Contact <br /> FA0003787 PR0232437 SCO01 01/13/2023 <br /> EHD 23-01 Rev.12/06/2021 Page 6 of 6 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />