My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 3:09:37 PM
Creation date
1/18/2023 8:57:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San.Joaquin General Hospital <br /> 500 W Hospital Rd <br /> French Camp CA <br /> San Joaquin Environmental Health Department <br /> Attn: Vicky Varig-Lee <br /> RE: Underground Storage Tank Program Inspection of August 25,,2023-RTC Statement <br /> Statement Reply to Item# 122-Violation CCR 2712(f) Failure to implement corrections <br /> and submit written response within 30 days of receiving the report. <br /> The Return to Compliance form for the inspection report last done on August 19, 2022 <br /> was electronically submitted to SJEHD on August 23, 2022. Our service request <br /> (SR0085779) was received on October 25,2022. Once the permit was approved we <br /> ordered equipment;the equipment shipped November 30, 2022. January 18,2023 EHD <br /> was onsite and witnessed the replacement of the diesel fill and turbine sump sensors <br /> and the installation of the leak detector. (No testing was performed at this time). <br /> Attached is the confirmation email the RTC was received August 2022. <br /> II <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.