Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Site Address: San Joaquin Hospital&Engineering Plant 500 W Hospital French Camp <br /> KEY <br /> A=ANNULAR <br /> F=FILLS <br /> T=TURBINE <br /> P=PROBE <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . V=VAPOR <br /> O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . X=SUMP SENSOR <br /> L=Leak Detector <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M=Manway <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B=Brine Sensor <br /> RED DIESEL . . . . . . I=Smart Sensor <br /> S=STP <br /> O C=Floats&Chains <br /> OF . . . . . . . . . . . . . . . . E=E Stop <br /> GD <br /> Gen 1 <br /> DAY <br /> TANK <br /> Gen 2 <br /> DAY <br /> TANK <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . ATG . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . .Line Continues to Boilers. . . <br /> *PIPING <br /> (ARROWS) <br /> Drawing of piping <br /> exit of sump and <br /> OFFICE UDC's.No <br /> . ' ' ' ' ' ' ' ' ' ' ' ' underground <br /> drawing is <br /> X Line Test Port accurate,we <br /> cannot speculate <br /> EDY blue prints. <br /> K <br /> Any items underground that are not visible to the certifying technician are a <br /> professional opinion only and are solely for informational purposes. Drawing <br /> not to scale <br /> Date map was drawn: 8/24/23 <br /> Page 6 of 6 <br />