Laserfiche WebLink
a9/aa <br />ESPteL v RN <br />n(ml .: <br />FUEL SYSTEM PIPING PLAN <<\ <br />SCALE: I' 10' NSE G-4APHIC SCALE FOR REDUCEC PLOT51 SITE P_:-\ GEV=LDPFC FROM PROV D==; DRAW'NG-5. �'�' <br />'4-5 IS \OT A SLRVEY. PLbu <br />0 10 20 A0 <br />FUEL SYSTEM KEYNOTES <br />NEW UNDERG-ROUND STORAGE TANKS N5T6). COL:BLE-WALL FBERa'L455 REIIFORG'cD PLASTIC (F.RP.1 TANKS W/ LIQUID-FILLEC <br />ANNULARANTERSTICE, DEADMEN AND HOLD-DOJNS, BY XERXES. ONE 20< S" OCTANE UNLEADED GASOL'NE. ONE 20K SPLIT TANK W/ 12K 91 <br />OCTANE UNLEADED GASOLINE AND BK DIESEL. <br />Z. NEW (N) TANK VENT RISERS ON (NI RISER RACK INSTALL LISTED =LEX CONNECTORS AT BASE AND CONNECT -O TANK VENT PIPING, WITHIN (N) <br />DOUBLE -WALLED. LIQJID-FILLED INTERSTICE, CONTAINMEN' / TERMINATION SUMP. MANIFOLD G45OLINE VENT RISERS. PRO -ECT W/ BOLLARDS, A5 <br />SHOWN. <br />INSTALL NEW VEEDER-ROOT ENHANCED VAPOR RECOVERY (EVR) CARBON CANISTER VAPOR POLISHER (CCVF) 5`-57EM AT MANIFOLDED <br />GASOLINE VENT RISER INS"ALL PER MN=R RECOMMENGGTIONS AND CURREN' C.A.R3. EXECUTIVE ORDER VR -204-x (Z). MAINTAIN MATERIAL / <br />EQUIPMEN- CLEARANCES PER MNFR INSTALLATION PROCEDURE. <br />d. NEW VACUUM MONITORED, CONTAINED TANK VENT PIPING. FIBERGLASS RE'NFORCED PLASTIC (FRP.), MINIMUM PRIMARY PIPE SIZE TO BE 2"e. SLOPE <br />BACK TO TAN<5 AT 1/5" PER FOOT, MINIMUM. <br />5. NEW DISPENSERS ON NEW DOUBLE -WALLED, L QUID -FILLED INTERSTICE, UNDER DISPENSER CONTAINMEN"UDC% r SHEAR VALVE SYST=MS. W/ FLOAT <br />CH SUMP PROBES, TYPICAL. CONFIRM DISPENSING MODELS W/ EOU'.PMENT LIST. INS -ALL IN -STATION DIAGNOSTICS lLSDJ VAPOR FLOW METER <br />ABOVE VAPOR SHEAR VALVE. PROVIDE CONDUIT. SEAL -OFFS AND LIRE PER MNFR INSTALLATION PROCEDURES. TYPICAL OF (2) 3:046 AND (4) <br />3�Ib. <br />6. INSTALL SINGLE ISD. PRESSURE SENSOR AT VENT MANIFOLD .'ALT. - IN VAPOR LINE BELOW DISPENSER CLOSEST TO USTs). <br />VACUUM MONITORED, CONTAINED PJA5E II VAPOR RECOVERY PIPING, FRP., MINIMUM 3" s PRIMARY PIPING FROM DISPENSERS TO GA50LINE <br />igN<S, TYPICAL. 2" PRIMARY PIPING O< TO SINGLE DISPENSER SLOPE TO TANKS AT I/B° PER FOOT, MIN. <br />e. NEW VACUUM MONITORED, CONTAINED =.RP. PRODUCT PIPE W/ VIP, MINIMUM, PRIMARY PIPE, TYPICAL. S'_OPE TO 'ANKS AT 1/5" PER FOOT. MIN. <br />9. TAN< ANNJLGR RISER W/ HYDROSTATIC PROBE AND MANWAY, TYPICAL, <br />10. NEW AUTOMATIC TANK GAUGES W/IN TURBINE SUMP.-YPIGAL. <br />II. NEW SUBMERSIBLE TJRBINE PUMPS lSTP), TYPICAL, WAN DOUBLE -WALLED, LIQI.ID-FILLED INTERSTICE. F.R.P. CONTAINMENT SUMP W/ FLOAT SWITCH <br />SUMP PROBE. LID. AND MANWAY ASSEMBLY. 4U -O STP SHUTDOWN ON PROBE ALARM AND IF ANT ON THE MONITORING SYSTEM FAILS OR IS <br />DISCONNECTED. <br />Lu x <br />I2. NEW ENHANCED VAPOR RECOVERY (EVRI -ANK RLL ASSEMBLY W/ 5 GALLON ;MIN: F'LL CONTAINMENT (TYPICAL OF 3) AND 5 GALLON (MIND <br />CONTAINMENT FOR AT PHASE I VAPOR RECOVERY A- GASOL'NE TANKS (TYPICAL OF 2), WAIN DOUSLE-W'AL_ED, L'QUID-FILLED INTERSTICE, <br />CONTAINMENT SUMP, W/ FLOAT SWITCH SJMP PROBE. AND MANWAY ASSEMBLY. <br />19. BACKFILL T FNCHES W/ PEA GRAVEL TO LEVEL REQUIRED FOR NEW SLURRY COVER AND PAVING BASE. PROVIDE CONCRETE 4" THICK MIN. OVER <br />PEA GRAVEL. <br />14. NEW CONCRETE DRIVE SLAB, "1NIMUM 6' THICK W/'4 BARB AT IS" O.G. BOTH WAYS. OVER At OF 3/4" CRUSHED ROCK OVER 6" AGG. BASE. CONFIRM <br />MIN. PAVING DESIGN MATCHES CIVIL/STRUCTURAL ENGINEERING REAS. AND GEOTECHNICAL REPORT RECS. CONFIRh SLAB CONFIGURATION W/ <br />gRG141TECTURAL AND/OR CIVIL SHEETS. <br />15. NEW B' THICK (AT 60" BURY), CONCRETE TANK SLAB W' 04 REBAR AT 18" OZ. BOTH WAYS. CONFRM SLAB REQJIREMRNTS W/ CIVIL AND/OR <br />STRJCTJRAL DOGUMEN'S. <br />I6. NEW FUEL SYSTEM PANELS. CONTROLS, MONITORING CONSOLE AND ALARM IN (N) BUILDING. INSTALL NEW MONITORING SYSTEM, CONTROLS AND <br />DISPENSER INTERFACE COMPONENTS, AS REQUIRED. <br />n. OVERFILL ALARM WITH ACKNOWLEDGMENT SWITCH. MOUNT ON THE VENT RAC<, VISIBLE FROM THE UST TAN<ER-FILL POSITION. <br />IB. NEW GONG. FILLED BOLLARDS, TYPICAL OF FOUR (4) PER DISPENSER 6" 50, 42" HIGH, INSTAL_ PER DETAIL. <br />NEW EMERGENCY 5HUT-0�5 (ESO). (I) INSTALL NEW BOLLARD IN PLANTER AND MOUNT ON BOLLARD W/ VISIBLE SIGN, AND INSTALL (1) ON THE <br />SLORE FRONT W/ VISIBLE SIGN. SEE GENERAL NOTES. CONFIRM LOCATIONS W/ FIRE DEPT. APPROVALS. <br />20. CONTRACTOR 54ALL PAINT ALL EXPOSED METALS, UNLESS F'R=FINISHED, W/ SUITABLE PAINT IN APPROVED COLORS. <br />21. PIPING 15 SHOWN SCHEMATIC, AND MAY BE EXAGGERATED FOR DRAFTING CLAR'T". VARIA-IONS DUE TC FIELD CONDITIONS FOUND ARE <br />EXPECTED PROVIDE "AS -BUILT" PLAN SHOWING CONFIGURATIONS AS INSTALLED. <br />2"s. PROVIDE ALL FJEL SYSTEM TESTING REQUIRED FOR THE OPENING OF THE FAC LITY, INCLUDING SB959, EN4A\CED LEAK DETECTION 0ELD) FINAL <br />TESTING FOR THE NEW SYSTEM, MONITORING CERTIFICATION, AIR QLALI7Y PRE c FINAL TESTING, ETC.. AS APPROPR'ATE. <br />^3. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND TESTED PER MANUFACTURERS INSTRUCTIONS, APPLICABLE CODES AND STANDAI; i5. <br />THE PLANS AND SPECIFICATIONS. AND LOCA'_ AGENCY REQUIREMENTS. ALL SECONDARY CONTAINMENT SYSTE`15 WILL BE CONSTRUCTED TO <br />PREVENT ANY WATER INTRIJ51ON INTO THE 5`-5700 BY PRECIPITATION, INFILTRATION, OR SURFACE RUNOFF, <br />GENERAL NOTES <br />A. PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED IN AGGORDANGE WITH CALIFORNIA FIRE CODE (CFC) SECTION 23055 AND 906. INSTALL GT <br />LEAST TWO PORTABLE FIRE EXTINGU'SHOR (FE.J W� d MINIMUM RATING OF 2-A:20-B:C AS 5-ICW�I. THESE EicTIN!aJ15HER5 TO BE 4FF'.kED TO G <br />LOCATION ON A MOUNTING- BRACKET OR IN A FIRE EXTINGUISHER CABINET, AND LOCATED NOT MORE THAN 75 FEET FROM PUMPS, DISPENSERS OR <br />STORAGE TANK FILL -PPE OPENINGS. <br />B. G CLEARLY LABELED, MANUALLY OPERATED PLMF MAS -ER SWITCH 5HALL BE PROVIDED IN AN APPROVED LOCATION W/IN 100 FEET, BUT NOT <br />NEARER THAN 20 FEET TO, ANY DISPENSER WHERE SUCH MASTER 5WITCH 16 NOT VISIBLE FROM ALL C1.5PENSERS, THE LOCATION 7LIEREOF SHALL <br />BE INDICATED BY APPROVED SIGNS. SIGNS IDENTIFYING TLE PUMP MASTER 5W'ICH 5WALL BE LABELED "EMERGENCY FUEL SHJTOFF'. THE <br />MASTER 5WITGH ON ALL INDIVIDUAL PUMP CIRCUIT SWITCHES SHALL BE SET IN THE "OFF' POSITION BEFORE C'_05iNG THE STATION FOR BJ51NESS AT <br />ANY TIME. (CFC 23032) <br />G ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND TESTED PER'-IANUFACTURER'S INSTRUCTIONS, APPLICABLE CODES AND 5"ANDARDS. <br />THE PLANS AND SPECIFICATIONS, AND LOCA_ AGENCY REQUIREMENTS. <br />G. FEEL SYSTEM CONTRACTORS AND INSTALLERS SHALL NAVE ALL CURRENTLY REQUIRED EQUIPMENT MANUFACTURERS' CERTIFICGTONS AND <br />APPROVALS FOR INSTALLATION OF ALL O= THE FUEL SYSTEM RELATED WORK, INCLUDING =JEL SYSTEM ELECTRICAL COMPONENTS, AND SHALL <br />VIDE A COMPLETE, uCRKABLE FUEL 5`"5TE0 PER MANUFACTURERS' AND CODES' REQ. REMEN'S. THE FUEL SYSTEM'S ELECTRICAL 51 STEMS <br />INCLUDE, BUT ARE NOT LIMITED TO, HIGH A LOW /OLTAGE POWER MONITORING AND CCMMUNPCATiONS (INTERCOM I CONTROL) REQUIREMENTS. <br />E. TANK ( DRIVE SLAB CONCRETE SHALL BE CAPABLE OF PASSING A MINIMJM COMPRE55'VE 51RENG-H OF 3500 Psl AFTER 28 DAYS, AND 5HALL <br />OTHERWISE FOLLOW.' THE CONCRETE DESIGN AS SPECIFIED IN THE CIVIL/ARCH DOCUI'.ENTS. CONC. CE5 GN STRENGTH OVER 2500 psi IS BY OWNER <br />PRE =RENGE, NOT DESIGN REQUIREMENTS, AND DOES NOT REQUIRE SPECIAL INSPECTIONS. EXP4,.S CI\ JOINTS AT DR VE AND TANK SLA55 SHALL <br />BE SEALED W/ FJEL COMPATIBLE MAT_RIAL5, <br />F. MATERIALS OF CONSTRUCTION FOR UNDERGROUND STORAGE TANKS, PIPING AND SECONDARY CONTAINMENT SYSTEMS SHALL BE COMPATIBLE WITH <br />THE STORED HAZARDOUS SUBSTANCES, INCLUDING ALCOHOLS(METHANO_, ETHANOL, ETC.) AND ALCOHOL-GG50_INE MIXTURES, W4ICH 56ALL BE <br />DOGUMENTEC AS COMPATIBLE BY THE MANUFACTURER AND/OR BY AN APPROVED INDEPENDENT TESTING ORGANIZATION. <br />G. CONSPICUOUSLY POST 'WARNING SIGNS WITHIN SIGHT 0= EACH DISPENSER FACE, PER CFC 2305.6. <br />MONITORING NOTES <br />A. THE UNDERGROUND STORAGE TANK (USTs), LANK SUMPS. VENT TRANSITION /CONTAINMENT SUMP, AND UNDER DISPENSER GON <br />TA'NMENT .'LDA: SUMPS <br />GRE ALL DOUBL WALLET. WITH LIQUID FILLED INTERSTICE, HYDRCSTATICA_LY MO\'ITORED. AL_ SUMPS ARE 4L50 MONITORED BY A LIQUID <br />SENSING- PROBE W/IN EACH SUMP. <br />B. THE PIPING- 15 ALL DOUBLE WALLED, WITH A VACUUM FILLED INTERSTICE, WHIG+ 15 MON'TORED FOR THE PRESENCE OF LIQUID AND CHANGES IN THE <br />vACUU M PRESSJRE. W/ SENSORS IN THE TURBINE SUMPS. THE VENT PIPING INTERSTICE 15 MANIFOLDED IN THE VENT TRANSITION / CONTAINMENT La <br />SUMP AND MONITORED W/IN THE 91 OCTANE GASOLINE 5JMP. THE VAPOR RECOVERY PIPING INTERSTICE 15 MANIFOLDED AND MONITORED W/'N THE <br />Bl OCTANE GASOLINE SUMP. EACH PRODUCT PIPE INTERSTICE IS MONITORED WAN 'TS TJRBINE SUMP. <br />G. THE PRE55UR ZED PRODUCT PIPING 15 MONITORED BY AN ELECTRONIC LINE LEAK DETECTOR, LOCATED AT -HE SUBMERSIBLE -URBINE PJMP <br />f5TP1 MANIFOLD ASSEMBLY, WHICH WILL AUTOMATICALLY SHUT DOWN THE TURBINE IF AN A_AR"I OCCURS. LU <br />D. USTa ARE EQUIPPED W/ POSITIVE S141.1 --OFF DEVICES O's THE FILL TUBES, SE- FOR 95% OF -AN'K CAPACITY MAX, THE UBTs ALSO NAVE AUTOMATIC <br />TAN<GAUGES (ATGs) WHICH MONITOR CHANGES IN THE LEVEL OF PRODUCT AND WLTER IN THE TANKS. A'Gs PROVIDE OVER=ILL ALAO" AND <br />REPORT, ONLY4 AT 90% OF TANK CAPACITY, W/O 5TP SHUTDOWN. <br />E. AUTO STP SHUTDOWN WILL OCCUR ON A LIQUID -SENSING PROBE ALARM THAT 15 W/IN A 5JMP THAT -IAS PRESSURIZED PRODUCT PIPING, E. TLR51NE <br />SUMPS AND JDC6. LIQUID-SEK51NO PROBES W/IN SUMPS'HAT HAVE NO PRESSURIZED PRODUCT P'PING. I.E. FILL SJMPS AND -NE VENT TRANSITION / <br />CONTAINMENT SUMP MAY ALARM, W/O 5TP SWJ-DOWN. VACUUM 5EN50RS MAY WARN ONLY, W/O 5TP SHUTDOIN, IN THE ABSENCE O= <br />LIQJID DETECT ON. LOUID DETECTED B`- THE VACUUM SENSING S"5 -EM WILL ALARM AND 5HUT DOWN THE 5?. THE <br />HYDROSTAT.0 PROBE FOR THE J5T INTERSTICE MA`- ALARM. W/O 5TP SHUTDOWN. PER TL5 SYSTEM PROGRAMMING. '� O <br />F. IN- STATION DIAGNOSTICS (ISD/ WILL ALARM AND SWJT DOWN TURBINE FOR CERTAIN DESIGNATED ALARMS. <br />G. AUTO 5TP 5HUTDOWN WILL AL50 OCCUR IF ANY OF THE MON'TORING SYSTEM FAILS OR 15 DISCONNECTED. <br />U � <br />Z � <br />Q1 <br />Z mUmLL <br />¢ N <br />Uwj BQlOn <br />Xz(vr <br />Z QWmm <br />Jp mF^� <br />N QI <br />F <br />3 <br />% <br />W �imgU�LLJU <br />J�XQ�OmuiIn <br />UowQ�mmLU <br />dN Q.m H <br />�a <br />m3 '0Q <br />O] 0 <br />_H�� O N <br />EZ <br />W <br />U <br />J <br />MOP <br />W <br />Q <br />B <br />Q <br />J <br />Q <br />d <br />F <br />d <br />a <br />= <br />> <br />w <br />= <br />O <br />W <br />O <br />Q <br />W <br />Z W W 9 <br />0 Q � 7 . <br />aWW �dus <br />Fill W07Q <br />f/)Z� Wpc5m <br />�a �y0m <br />Q Q Q m <br />©NNQ <br />r <br />PET -7 <br />0= 10 "PET" SHEETS <br />J <br />3 <br />d <br />> <br />w <br />Q <br />r <br />Q <br />Q <br />PET -7 <br />0= 10 "PET" SHEETS <br />