Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Site Address: San Joaquin Regional Transit—2849 E Myrtle Street Stockton,CA 95201 <br /> *PIPING <br /> (ARROWS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Drawing ofpiping . . . . . . . . . . . . . . . . . . . . . . . . KEY <br /> exit of sump and . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A=ANNULAR <br /> UDC's.No . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F=FILLS <br /> underground . . . . . . . . . . . . T=TURBINE <br /> drawing is . . . . . . . . . . . . . 87.F P=PROBE <br /> accurate,we .VENT. . . . . . . . . . . . . . . . . . . . . . V=VAPOR <br /> cannot speculate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . X=SUMP SENSOR <br /> blue prints. L=Leak Detector <br /> f . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M=Manway <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> B=Brine Sensor <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> I=Smart Sensor <br /> S=STP <br /> C=Floats&Chains <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E=E Stop <br /> . x P x . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Tt T . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> B P B <br /> . tB <br /> x <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> B <br /> x <br /> . I B L. . . . . . . . . . . . . . . . . . . . . . . . . . <br /> x P x x <br /> . . . x O P . . . . . . . <br /> x <br /> B <br /> B O ❑V/R ATG. <br /> B <br /> x O g DSL VENT. . . . . . . . . . . . . . . <br /> x <br /> . . . . A A A . . . . . . . . . . . . . . X <br /> . . . . . . B . . . . <br /> . . . . .DSL. .DSL. . . . . .87. . . . . . . . . . . . . . . . . . . . . . . .DSL . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Trans Vent. . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Any items underground that are not visible to the certifying technician are a . . . . . . . . . . . . . . . . . <br /> professional opinion only and are solely for informational purposes. Drawing <br /> not to scale <br /> Date map was drawn:9/24/20 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />