My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 5:29:08 PM
Creation date
1/19/2023 3:58:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306046
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N Environmental Health Department <br /> COUNITY -- <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD ) <br /> 1 . Site map enclosed ? YES N NO [ ] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced . Ensure a copy of <br /> the "Site Health and Safety Plan" is available on the Jobsite as required by Title 8 . <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br /> how this will be done. ( If adding piping , UDC's , or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br /> Remove old rubber penetrations , Prep walls for FRP Bravo retrofit fittings . Test all sum s after <br /> after repairs and submit passing test results to CUPA <br /> �� nc1 in � tall(h"19 tl � w -fit�l►�' <br /> 4 . List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> f30 Bravo Entry Boot, Bravo Retrofit Epoxy <br /> RF - 30 -01 - U 3 " <br /> 5. Decontamination Procedures : <br /> a . Will piping be decontaminated prior to removal? YES [ ] NO V] <br /> b . Identify contractor performing decontamination : <br /> Name Phone �) <br /> Address City Zip <br /> RECEIVED <br /> 3or6 MAR 16 ? :i - ) <br /> ENVIRONMENTAL <br /> HEALTH DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.