My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 11:52:45 AM
Creation date
1/23/2023 11:05:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 7. LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line Ieak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified: (Check all that apply.) Yes No NA <br /> A 3 GPH ❑ 0.1 GPH ❑ 0.2 GPH <br /> Has the testing apparatus been properly calibrated? A J J <br /> For emergency generator tank systems, does the LLD create an audible and visual D D R) <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a ❑ Lj <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a release is 21 Ll ❑ <br /> detected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the <br /> monitoring system is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the 0 J ❑ <br /> monitoring system malfunctions or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected 23 ❑ ❑ <br /> for kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? A L] ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? <br /> LLD ID LLD Morel Lines Monitored Pass Fail <br /> Q1 848480-001 Supreme R1 Lj <br /> Q2 848480-001 Regular 0 ❑ <br /> i❑ ❑ <br /> ❑ Q <br /> ❑ Q <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ D <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> Q Q <br /> Describe all answers marked "No"or `Fail"and proposed remedy in Secrlon 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.