Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> SiEeAddress: CHEROKEE ARCO-3443 CHEROKEE RD STOCKTON <br /> "M <br /> • . • • C-STORE <br /> . . . . . . . . . . . . . . . . . . . . .0 . . I � 4 �. . . 0 . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . r <br /> . . . . . . . . . . . . . . . . . . . A=iNm.EAR Sensor <br /> . . . . . . . . . . . . . . . . . .� V=VAPOR <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . P=PROBE <br /> L=Turbine Leak Detector <br /> S7 _ 91 O _ X=SL'-%EP SE_VS0R <br /> B=Brine Sensor <br /> S=Smart Sensor <br /> SS . . . . . . C=Float:&Chau <br /> E=E Stop <br /> DSL <br /> *PWr G} <br /> X Dravvr ag of piping <br /> o exit of sump and <br /> tiDC's.\o <br /> underground <br /> drau•mg is <br /> SS accurate,the <br /> O X cannot speculate <br /> . . . . . . . . . <br /> � b'sue prints. <br /> _Attu•rtem:unI grorod them are rust visible to du ceri6ing ta•hnician are a <br /> Fgjassianl opinianorh ardcre sdeh fcs ir/or»ntran/prngxc Drming <br /> rot to mde <br /> Date map was drawn 72QU2020 <br /> Instinj tans <br /> If you already have a diagram that shows all required information.you may include rt rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,d installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> unnan.:.:n C..*—r.dwe tin. a.n.A of A 7r�1!07 <br /> Page 6 of 6 <br />