My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 10:29:54 AM
Creation date
1/25/2023 9:27:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Provide written notification to ust(E-Dsiggy.oLgI to arrange the follc <br /> notice is required for inspection appointments). <br /> a. Verification of the dispenser footprints contained by the t <br /> sumps (UD s). Any potential leaks from piping and fuel <br /> UD s. <br /> b. Senscr functionality in # 6 UDC and satellite #26: Functl <br /> system must be verified to ensure that monitoring has bE <br /> requirements of Title 23 California Code of Regulations <br /> c. Visual inspection of the product piping within the #26 dis <br /> d. Primary piping test diesel product and satellite pipe: Si <br /> penetrations (product, vapor recovery, vent, and oh <br /> hydrostatically at 150% of design operating pressure <br /> operating pressure. If the calculated test pressure is less <br /> as the test pressure. Testing must be conducted in <br /> specifications and California Code of Regulations (CCR) <br /> e. Secondary piping test of the diesel product and satellite <br /> penetrations (product, vapor recovery, gent, and chase), <br /> with manufacturer specifications. <br /> f. Integrity testing of x#26 UDC sumps, in accordance with r <br /> Thank you, <br /> V eeenae Zey?.ed <br /> (ED JONES COVEY G ROUP,INC. <br /> 9595 Lucas Ranch Road#100 <br /> Rancho Cucamonga,CA 91730 <br /> (888)972-7581 Office(Ext.278) <br /> (909)484-0300 Fax <br /> d Ivles@Jonescovey.com <br /> From: Martinez, Genesis [EHD] <gmartinez@sigov.org> <br /> Sent: Monday, March 6, 2023 11:38 AM <br /> To: Desirae Lyles<dlyles@ionescovey.com>; EH-UST<ust@sigov.org> <br /> Cc:Saetern, Kristina Gaen [EHD] <ksaetern@sll;ov.org>; Rivera, Stacy [EHD] <srivera@s*gov.org>;Joanna Ratterman <br /> <jratterman @jonescovey.com> <br /> Subject: RE: SR0086196- 1501 N.Jack Tone Rd., Ripon -WO#2258953-1 Final Inspection <br /> Hi Desirae, <br /> What will be done during the final inspection so I can add it your appointment notes for the inspector? <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.