Laserfiche WebLink
. Provide written notification to ust(E-Dsiggy.oLgI to arrange the follc <br /> notice is required for inspection appointments). <br /> a. Verification of the dispenser footprints contained by the t <br /> sumps (UD s). Any potential leaks from piping and fuel <br /> UD s. <br /> b. Senscr functionality in # 6 UDC and satellite #26: Functl <br /> system must be verified to ensure that monitoring has bE <br /> requirements of Title 23 California Code of Regulations <br /> c. Visual inspection of the product piping within the #26 dis <br /> d. Primary piping test diesel product and satellite pipe: Si <br /> penetrations (product, vapor recovery, vent, and oh <br /> hydrostatically at 150% of design operating pressure <br /> operating pressure. If the calculated test pressure is less <br /> as the test pressure. Testing must be conducted in <br /> specifications and California Code of Regulations (CCR) <br /> e. Secondary piping test of the diesel product and satellite <br /> penetrations (product, vapor recovery, gent, and chase), <br /> with manufacturer specifications. <br /> f. Integrity testing of x#26 UDC sumps, in accordance with r <br /> Thank you, <br /> V eeenae Zey?.ed <br /> (ED JONES COVEY G ROUP,INC. <br /> 9595 Lucas Ranch Road#100 <br /> Rancho Cucamonga,CA 91730 <br /> (888)972-7581 Office(Ext.278) <br /> (909)484-0300 Fax <br /> d Ivles@Jonescovey.com <br /> From: Martinez, Genesis [EHD] <gmartinez@sigov.org> <br /> Sent: Monday, March 6, 2023 11:38 AM <br /> To: Desirae Lyles<dlyles@ionescovey.com>; EH-UST<ust@sigov.org> <br /> Cc:Saetern, Kristina Gaen [EHD] <ksaetern@sll;ov.org>; Rivera, Stacy [EHD] <srivera@s*gov.org>;Joanna Ratterman <br /> <jratterman @jonescovey.com> <br /> Subject: RE: SR0086196- 1501 N.Jack Tone Rd., Ripon -WO#2258953-1 Final Inspection <br /> Hi Desirae, <br /> What will be done during the final inspection so I can add it your appointment notes for the inspector? <br /> 2 <br />