Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: STOCKTON MOBIL#2—3440 E Main St Stockton-95205 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . KEY <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A=ANNULAR <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F=FELLS <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . T=TURBINE <br /> . . . . . . . . . . . . . . . P=PROBE <br /> A A A V=VAPOR <br /> X=SUMP SENSOR <br /> V V V L=Leak Detector <br /> M=Manway <br /> I =Brine Sensor <br /> F F F =Smart Sensor <br /> O <br /> S=STP <br /> C=Floats&Chains <br /> DSI E=E Stop <br /> . . <br /> O O . . . . . . . . . . . <br /> aO . . . . . . . . . . . . . . . . . . . . . . . <br /> . i TL TL . . . . . . . . . . . . . . . . . . . . . . . . <br /> nhL X X . . . . . . . . . . . . . . . . . . . . . . . <br /> x . . . . . . . . . . . . <br /> S <br /> . <br /> t . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . r . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . STORE <br /> e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> t <br /> . . . . . . . . . . . .� . . . . . . .M . . . . . . . . . . . <br /> *PIPING* . . . . . . . . . <br /> (ARROWS) . . . . . . . . . . .� . . .�. . . . . <br /> Drawing of . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> piping exit of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . sump and UDC's. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . No underground . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> drawing is <br /> accurate,we ATG <br /> cannot speculate <br /> . . . . blue prints. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> L_Lu��� <br /> I <br /> Date map was drawn:2/9/21 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />