My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
525
>
2300 - Underground Storage Tank Program
>
PR0231002
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2023 11:49:16 AM
Creation date
1/25/2023 2:47:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231002
PE
2361
FACILITY_ID
FA0002864
FACILITY_NAME
DAMERON HOSPITAL
STREET_NUMBER
525
Direction
W
STREET_NAME
ACACIA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13715304
CURRENT_STATUS
01
SITE_LOCATION
525 W ACACIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J 0 A Q I I I Irl Environmental Health Department <br /> CCUNT <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> DAMERON HOSPITAL 525 W ACACIA ST, STOCKTON February 27, 2023 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br /> 1)OBSERVATION:The designated operator failed to check and note the correct test dates for the secondary <br /> containment and line tightness tests on the designated operator inspection reports. <br /> -The secondary containment test was performed on 1/21/2021. <br /> -The primary line tightness test was performed on 2/5/2021. <br /> REGULATION GUIDANCE: During the inspection, the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> ----------------------------------------------------------------------- <br /> 2)OBSERVATION:The designated operator failed to check and note all required items on the visual inspection <br /> reports.The incorrect and missing information included the following from the inspection reports: <br /> -The reports inaccurately listed the UST's address as 825 W Acacia St. <br /> REGULATION GUIDANCE: During the visual inspection,the designated operator shall check that all required <br /> testing and maintenance for the UST system have been completed and shall check all required items on the report. <br /> CORRECTIVE ACTION: Ensure that designated operators performing visual inspections at this facility are including <br /> all of the required information on the reports. <br /> This is a repeat violation, Class ll. <br /> 209 CCR 2715(c)(3), 2715(c)(4) Failure to maintain a copy of the"Facility Employee Training Certificate"on-site. <br /> OBSERVATION: The Facility Employee Training Certificate dated 8/11/2022 listed incorrect initial training date for <br /> Felipe Gomez. <br /> REGULATION GUIDANCE:All site employees must be trained prior to taking responsibility as a facility employee if <br /> after October 1, 2018, or within 30 days of hire if prior to October 1, 2018. The Facility Employee Training <br /> Certificate shall contain accurate information for all employees trained. <br /> CORRECTIVE ACTION: Update the Facility Employee Training Certificate to contain the accurate information and <br /> submit a copy of the updated form to the EHD. <br /> This is a repeat violation, Class II. <br /> Overall Inspection Comments: <br /> An inspection checklist was provided to the facility operator on the day of inspection. The EHD has written the <br /> complete report which replaces the initial checklist. <br /> Note: The leak detector and annual line tests could not be conducted today because the lines were unable to be <br /> FA0002864 PR0231002 SCO01 02/27/2023 <br /> EHD 23-01 Rev.12/06/2021 Page 9 of 10 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.