Laserfiche WebLink
Environmental Health Department <br />Underground Storage Tank Program Inspection Report <br />Date: <br />February 27, 2023 <br /> Facility Address: <br /> 4800 S AIRPORT WAY, STOCKTON <br /> Facility Name: <br /> A G SPANOS AVIATION DEPT* <br />Single-Walled Non-Pressurized Piping <br /> 404 □ V □ R □ COSFailure to conduct 0.1 gph test on single-walled gravity piping biennially or post repair (pre-1984)CCR 2643(e), 2661(f) <br />Other Violations <br /> 2010 □ V □ R □ COSUnlisted General violation See below <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />RemarksItem # <br /> 115 CCR 2638(c), 2638(d) Failure to submit "Monitoring System Certification Form" within 30 days of completion of the <br />test. <br />OBSERVATION: Annual monitoring system certification and leak detector testing was performed on 2/11/22 and a <br />test report was submitted on 4/13/22, 31 days late. <br />REGULATION GUIDANCE: A copy of the test report must be submitted within 30 days of the tests. <br />CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br />performed in a timely manner. <br />This is a repeat violation, Class II. <br /> 116 CCR 2637.1(d), 2637.1(e) Failure to submit the "Spill Container Testing Report Form" within 30 days. <br />OBSERVATION: Annual spill container testing was performed on 2/11/22 and a test report was submitted on <br />4/13/22, 31 days late. <br />REGULATION GUIDANCE: A copy of the test report must be submitted within 30 days of the tests. <br />CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br />performed in a timely manner. <br />This is a repeat violation, Class II. <br /> 310 CCR 2636(f)(4) Failure to meet monitoring requirements in lieu of being tightness tested every 12 months. <br />OBSERVATION: The three jet fuel tanks did not cause shutdown and do not meet the requirements for annual line <br />tightness testing exemption. <br />REGULATION GUIDANCE: All pressurized piping with secondary containment shall be pressure tested at least <br />once every 12 months at a minimum release detection of 0.1 gallons per hour at 150 percent of the normal <br />operating pressure. Continuous monitoring systems that are fail safe and shut down the pump when a leak is <br />detected, or optionally stop the flow of product at the dispenser if the leak is in the under dispenser containment <br />(UDC), shall satisfy the requirement for annual line tightness testing. <br />CORRECTIVE ACTION: Immediately schedule an annual line tightness test and provide 48 hours notification to the <br />EHD. <br />This is a Class II violation. <br />FA0003809 PR0231509 SC001 02/27/2023 <br />EHD 23-01 Rev. 12/06/2021 Underground Storage Tank Program OIRPage 4 of 5 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD