Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID 1-87-PS 2-Diesel-PS <br /> Sump Manufacturer XERXES XERXES <br /> Sump Depth (inches) 38" 41" <br /> Sump Bottom to Top of 16" 18" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:28 1:22 <br /> Initial Reading .001 .001 <br /> Test End Time 12:58 1:52 <br /> Final Reading .001 .001 <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria > .002 > .002 <br /> Tightness Test Results M Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID UDC 1&2 UDC 3&4 UDC 4-Sat <br /> Sump Manufacturer Environ Environ Environ <br /> Sump Depth (inches) 30" 30" 30" <br /> Sump Bottom to Top of 9" 9" 10" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:37 12:40 12:42 <br /> Initial Reading .001 .001 .001 <br /> Test End Time 1:07 1:10 1:12 <br /> Final Reading > .030 > .030 > .030 <br /> Change in Reading > .030 > .030 > .030 <br /> Pass/Fail Criteria > .002 > .002 > .002 <br /> Tightness Test Results ❑ Pass ® Fail ❑ Pass ® Fail ❑ Pass M Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />