My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2800 - Aboveground Petroleum Storage Program
>
PR0516364
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 3:54:25 PM
Creation date
1/27/2023 11:52:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0516364
PE
2832
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IN.-7 68CGRS <br /> DELIVERED <br /> February 20, 2023 Page 1 of 5 <br /> Vanessa Cortez <br /> J&L Market <br /> 8125 South EI Dorado Street <br /> French Camp, CA 95446 <br /> Email: and levk63(@gmail.com <br /> Cel 1:209-451-7520 <br /> Subject: Scope of Work to Repair the Diesel AST <br /> Vanessa, <br /> CGRS, Inc. (CGRS) is pleased to submit the following Scope of Work to repair the diesel AST <br /> product tank. <br /> A general description of the work to be performed is to line the diesel tank and raise the containment <br /> walls to hold 10,000 gallons. CGRS will work injunction with BAT&Coatings LLC to inspect and line <br /> the AST, see attached Scope of Work. CGRS will assist BAT&C to gain entry into the tank. CGRS <br /> will provide tank testing and stand inspections as required per CUPA's requirements. <br /> CGRS/BAT&C will prepare plans and submit permit applications to the County of San Joaquin Valley <br /> CUPA. <br /> 1.0 SCOPE OF WORK: <br /> Task I- Pre-construction activities <br /> • Submit plans to CUPA for approval <br /> • Prepare site for construction as required <br /> Task 11— Tank Lining &Above Ground Tank Enclosure Containment Enlargement <br /> • Prepare site for BAT&C to perform tank entry & lining/repair of the tank <br /> • Stand BAT&C's lining/repair installation <br /> • Add cinder block to the existing containment structure to hold 10,000 gallons <br /> • Provide Soil Sampling per approved work plan <br /> • Call for inspections as required by CUPA <br /> • Preform tank testing <br /> Task ill— Finalize project <br /> • Schedule owner supplied fuel drop <br /> • Call for required inspections <br /> • Gather and deliver warrantees and operation and maintenance material <br /> • Deliver final project documentation <br /> CGRS anticipates onsite construction will take 5-6 days. <br /> Please call or email me should you have any further questions regarding this Scope of Work. <br /> Submitted by: CGRS, Inc. <br /> CGRS, Inc. 444 Dry Creek Rd. <br /> Sacramento, California 95838 <br /> /ffatt 714was Cell (626-627-8316) <br /> Matt Thomas State of CA Contractors License #803616 <br /> Business Development Class "A/C61/D40/D63/HAZ" — HAZWOPER Certified <br />
The URL can be used to link to this page
Your browser does not support the video tag.