My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
322
>
2300 - Underground Storage Tank Program
>
PR0516472
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2023 10:43:58 AM
Creation date
1/27/2023 4:57:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0516472
PE
2361
FACILITY_ID
FA0012628
FACILITY_NAME
SYNERGY PETROLEUM 322 INC
STREET_NUMBER
322
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14906111
CURRENT_STATUS
01
SITE_LOCATION
322 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer © Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure © Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Vacuum Pump/Vacuum Gauges in Hg. <br /> Tank ID 1-Regular 87 2-Super 91 <br /> Tank Manufacturer XERXES XERXES <br /> Tank Capacity 20K 15K <br /> Test Start Time 8:30 8:40 <br /> Initial Reading -10" Hg. -10" Hg. <br /> Test End Time 10:30 9:40 <br /> Final Reading -10" Hg. -10" Hg. <br /> Change in Reading 0" Hg. 0" Hg. <br /> Pass/Fail Criteria No Loss No Loss <br /> Tightness Test Results ® Pass ❑ Fail I ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br /> Pipe Run ID 1-87-Product 2-87-Vent 3-91-Product 4-91-Vent <br /> Pipe Manufacturer Smith Smith Smith Smith <br /> Test Start Time 8:45 8:45 8:50 8:50 <br /> Initial Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time 9:45 9:45 9:50 9:50 <br /> Final Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Change in Reading 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Pipe Run ID 5-Gas Vapor <br /> Pipe Manufacturer Smith <br /> Test Start Time 8:45 <br /> Initial Reading 5 Psi <br /> Test End Time 9:45 <br /> Final Reading 5 Psi <br /> Change in Reading 0 Psi <br /> Pass/Fail Criteria No Loss <br /> Tightness Test Results © Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.