My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWELL
>
1975
>
2300 - Underground Storage Tank Program
>
PR0232521
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2023 12:16:42 AM
Creation date
1/30/2023 10:40:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0232521
PE
2361
FACILITY_ID
FA0004044
FACILITY_NAME
TRACY USD - SERVICE CENTER
STREET_NUMBER
1975
Direction
W
STREET_NAME
LOWELL
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23213008
CURRENT_STATUS
01
SITE_LOCATION
1975 W LOWELL AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />5. MONITORING SYSTEM AND PROGRAMMING <br />A separate Monitoring System Certification Form must be prepared for each control panel. <br />Make of Monitoring System <br />Model of Monitoring System <br />Software Version Installed <br />Control Panel <br />Control Panel <br />i TOUCH <br />O P W <br />SITE SENTINEL <br />Attach the post -certification reports if the monitoring system is capable of generating <br />Yes <br />No <br />NA <br />either; ✓❑Monitoring System Set-up ❑✓ Alarm History Report <br />All monitoring equipment is operational per manufacturer's specifications? <br />❑✓ <br />❑ <br />Secondary containment systems are free of damage, debris, or liquid? <br />❑✓ <br />❑ <br />Are the audible and visual alarms operational? <br />❑✓ <br />❑ <br />All sensors have been: 1) visually inspected for wiring kinks, breaks and residual <br />❑✓ <br />❑ <br />❑ <br />buildup on floats; and 2) tested for functionality and confirmed operational? <br />Are all sensors installed to detect a release at the earliest opportunity in the <br />❑✓ <br />❑ <br />❑ <br />secondary containment? <br />The monitoring system set-up was reviewed, and proper settings confirmed? <br />❑✓ <br />❑ <br />❑ <br />Was the monitoring control panel's backup battery visually inspected, functionally <br />❑✓ <br />❑ <br />❑ <br />tested, and confirmed operational? <br />Does the flow of fuel stop at the dispenser if a release is detected in the under- <br />❑✓ <br />❑ <br />❑ <br />dispenser containment? <br />Does the turbine automatically shut down if the piping secondary containment <br />❑✓ <br />❑ <br />❑ <br />monitoring system fails to operate or is electrically disconnected? <br />Does the turbine automatically shut down if the piping secondary containment <br />monitoring system detects a release? Which sensors initiate positive shut down? <br />❑✓ <br />❑ <br />❑ <br />(Check all that apply) ❑✓ Sump ❑✓ UDC <br />If monitoring system alarms are relayed to a remote monitoring center, is all <br />❑ <br />❑ <br />❑✓ <br />communication equipment operational? <br />Describe all answers marked "No" or "Fail" and proposed remedy in Section 9. <br />List all monitoring equipment either replaced or repaired in Section 9 <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.