Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> rt <br /> . 11ERFILL PREVENTION EQUIPMENT DETAILS <br /> lank ID Torre OPE per column) 1- <br /> Are both vent and tank riser piping a lies D Yes El Yes ❑ Yes <br /> secondarily contained? E9 No 0 No ❑ No ❑ No <br /> OPE Model <br /> What is the OPE response when activated? 0 Shut oft ❑ Shut off 0 Shut off ❑ Shut <br /> (Check all that apply.) Flow Flow Flow Flow <br /> r estricts ❑F estriots UI estdcts ❑Restri <br /> Flow Flour Flow Flow <br /> 0 Audible ❑ Audible 0 Audible ❑ Audit <br /> Alarm Alarm Alarm Alarr <br /> [l Visual 0 Visual 0 Visual C] visor <br /> {alarm Alarm Alarm Alam <br /> Are flaw reslrictors installed on vent piping 11 Yes" ❑ Yes* 0 Yes" ❑ Yes* <br /> that may interfere with the OPE operatics~ IR No 0 No 0 No ❑ No <br /> At ghat level in the tank is the 0 P E set to tl - <br /> activate? ,arches from bottom of tank <br /> What is the percent capacity of the tank at <br /> which the OPE activates? <br /> Is the OPE in paper operating condition to 191.`fes Ci Yes ❑ Yes D Yes <br /> respond when the stored substance 0 No 11 No ❑ No 11 No <br /> reaches the designated regulatory level's <br /> _ UIV1Mr41 if OF TESTING RESULTS ---�� <br /> OPE Inspeclion Results (9 Pass El Pass 0 Pass 0 Pass <br /> ❑ Fail ❑ Fail CI Fail ❑ Fall <br /> . COMMENTS _ <br /> Describe all results inarked "FBrf"arra#each proposed remady- <br /> Please contact me if you have any questions. <br /> Warm regards, <br /> 5 <br />