My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015375
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GOLDEN GATE
>
878
>
2600 - Land Use Program
>
PA-2200274
>
SU0015375
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2026 2:26:32 PM
Creation date
2/6/2023 10:12:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015375
PE
2632 - ADMINISTRATIVE USE - GENERAL (A)
STREET_NUMBER
878
Direction
N
STREET_NAME
GOLDEN GATE
STREET_TYPE
AVE
APN
14322001
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
878 N GOLDEN GATE AVE
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PA-2200274 (SA), Referral, S00015375 Page 2 of 3 <br /> 878 N. Golden Gate Avenue, Stockton APN: 143-220-01 May 8, 2025 <br /> will be barricaded so it cannot be driven over, parked on, or used as a storage area. This <br /> disposal field area must be used for that specific purpose only, and it cannot contain any <br /> underground utility lines (San Joaquin County Development Title, Section 9- <br /> 605.010(c)(3)(5)). <br /> 5) The applicant shall provide written confirmation from the water providers that improvements <br /> have been constructed or financial arrangements have been made for any improvements <br /> required by the agency and that the agency has or will have the capacity to serve the <br /> proposed development. Said written confirmation shall be submitted prior to the issuance of <br /> a building permit (San Joaquin County Development Title, Section 9-602.010). <br /> 6) Any geotechnical drilling shall be conducted under permit and inspection by The <br /> Environmental Health Department (San Joaquin County Development Title, Section 9- <br /> 601.010(b) and 9-601.020(i)). <br /> 7) Before any hazardous materials/waste can be stored or used onsite, the owner/operator <br /> must report the use or storage of these hazardous materials to the California Environmental <br /> Reporting System (CERS) at cers.calepa.ca.gov/ and comply with the laws and regulations <br /> for the programs listed below (based on quantity of hazardous material in some cases). The <br /> applicant may contact the Program Coordinator of the CUPA program, Elena Manzo (209) <br /> 953-7699, with any questions. <br /> a. Any amount but not limited to the following hazardous waste; hazardous material spills, <br /> used oil, used oil filters, used oil-contaminated absorbent/debris, waste antifreeze, used <br /> batteries or other universal waste, etc. — Hazardous Waste Program (Health &Safety <br /> Code (HSC) Sections 25404 & 25180 et sec.) <br /> b. Onsite treatment of hazardous waste — Hazardous Waste Treatment Tiered <br /> Permitting Program (HSC Sections 25404 & 25200 et sec. & California Code of <br /> Regulations (CCR), Title 22, Section 67450.1 et sec.) <br /> c. Reportable quantities of hazardous materials-reportable quantities are 55 gallons or <br /> more of liquids, 500 pounds for solids, or 200 cubic feet for compressed gases, with <br /> some exceptions. Carbon dioxide is a regulated substance and is required to be reported <br /> as a hazardous material if storing 1,200 cubic feet (137 pounds) or more onsite in San <br /> Joaquin County — Hazardous Materials Business Plan Program (HSC Sections <br /> 25508 & 25500 et sec.) <br /> d. Any amount of hazardous material stored in an Underground Storage Tank — <br /> Underground Storage Tank Program (HSC Sections 25286 & 25280 et sec.) <br /> i. If an underground storage tank (UST) system will be installed, a permit is required <br /> to be submitted to, and approved by, the San Joaquin County Environmental Health <br /> Department (EHD) before any UST installation work can begin. <br /> ii. Additionally, an EHD UST permit to operate is required once the approved UST <br /> system is installed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.