Laserfiche WebLink
Department of Public Works <br /> SAN 10AQUIN <br /> (Q Fritz Buchman,Director <br /> 1\^ 'rW�"� COUNTY <br /> r <br /> G re a f n e s s y r i r;s n,_,r UYar;�n g &r �`��tY Alex Chetley,Deputy Director—Development <br /> Kristi Rhea,Deputy Director-Administration <br /> David Tolliver.Deputy Director-Operations <br /> January 3, 2024 Najee Zarif, Deputy Director-Engineering <br /> MEMORANDUM <br /> TO: Community Development Department <br /> CONTACT PERSON: Sol Jobrack <br /> FROM: Christopher Heylin, Development Services Engineer <br /> Development Services Division <br /> SUBJECT: PA-2200274; A Site Approval application to establish truck parking for (151) <br /> trucks and to construct (3) buildings for tenant occupation in two (2) phases over <br /> five (5) years. Phase 1 includes paving and striping for parking (151) trucks. <br /> Phase 2 includes construction of(3) buildings (11,700 square feet each) for <br /> future tenant occupation; located on the west side of North Broadway Avenue, <br /> 385 feet north of East Fremont Street, Stockton. (Supervisorial District 1) <br /> OWNER: Frank Spingolo Warehouse Co. APPLICANT: Mike Smith Engineering <br /> ADDRESS: 878 N. Golden Gate Avenue, Stockton APN: 143-220-01 <br /> INFORMATION: <br /> The site is not currently located within a Federal Emergency Management Agency Designated <br /> Flood Hazard Area. <br /> Broadway Avenue has an existing and planned right-of-way width of 65 feet. <br /> Golden Gate Avenue has an existing and planned right-of-way per the City of Stockton. <br /> REQUIREMENTS; <br /> (+aR s it p94 or rdeeM GOMplete the app"GatiGR fnr this pFejeGt• <br /> 1810 East Hazelton Avenue I Stockton, California 95205 1 T 209 468 3000 1 F 209 468 2999 <br /> C Follow us on Facebook a PublicWorksSJC Visit our website: www.sjgov.org/pubworks <br />