Laserfiche WebLink
-3- <br /> PA-2200274 (SA) <br /> 10) This project is subject to the NPDES Region-Wide Permit requirements and shall comply <br /> with the following conditions. Prior to release of the grading permit, plans and calculations <br /> shall be submitted and approved by the Public Works Department—Water Resources <br /> Division (209-468-3605): <br /> a) Treatment: A registered professional engineer shall design the site to treat the 85th <br /> percentile storm as defined in the County's 2021 Storm Water Quality Control <br /> Criteria Plan (SWQCCP). <br /> b) Hydromodification: A registered professional engineer shall design the site to comply <br /> with the volume reduction requirement outlined in the County's 2021 SWQCCP. <br /> c) Trash: A registered professional engineer shall design the site to comply with the <br /> trash control requirement outlined in the County's 2021 SWQCCP. <br /> 11) Prior to release of the grading permit, the owner shall enter into an agreement with San <br /> Joaquin County for post-construction maintenance of stormwater quality facilities. <br /> 12) Prior to release of the grading permit the applicant shall submit the Storm Water Pollution <br /> Prevention Plan (SWPPP) to Public Works. A copy of the approved SWPPP and all <br /> required records, updates, test results and inspection reports shall be maintained on the <br /> construction site and be available for review upon request. <br /> 13) Applicant shall file a Notice of Intent (NOI) with the State Water Resources Control Board <br /> (SWRCB) and comply with the State"General Permit for Storm Water Discharges <br /> Associated with Construction Activity". The Waste Discharge Identification Number <br /> (WDID), issued by SWRCB, shall be submitted to Public Works prior to release of the <br /> grading permit. Contact the SWRCB at (916) 341-5537 for further information. <br /> 14) The applicant shall comply with the State Water Resources Control Board General Order <br /> No. 2014-0057-DWQ, "General Permit for Discharges of Storm Water Associated with <br /> Industrial Activities Excluding Construction Activities" permit. The WDID for the Industrial <br /> General Permit, or exemption from, issued by SWRCB shall be submitted to Public Works <br /> prior to release of the grading permit. <br /> 15) The intersection of Broadway Avenue and Fremont street shall be converted to an all-way- <br /> stop. <br /> Informational Notes: <br /> (i) Wastewater shall not be allowed into the storm drainage system. <br /> (ii.) The project will enact appropriate source control BMPs to prevent the discharge of <br /> trash offsite. <br /> CH:GM <br />