My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015375
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GOLDEN GATE
>
878
>
2600 - Land Use Program
>
PA-2200274
>
SU0015375
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2026 2:26:32 PM
Creation date
2/6/2023 10:12:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015375
PE
2632 - ADMINISTRATIVE USE - GENERAL (A)
STREET_NUMBER
878
Direction
N
STREET_NAME
GOLDEN GATE
STREET_TYPE
AVE
APN
14322001
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
878 N GOLDEN GATE AVE
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Spingolo <br /> Page 2 <br /> The attached summary of off-site fees is based on the cost of reductions ($/ton) identified <br /> in District Rule 9510, Section 7.2. Pursuant to District Rule 9510, the District may adjust <br /> the cost of reduction as necessary. In the event that there is a change in the cost of <br /> reductions, unpaid off-site fees would be recalculated using the off-site fee rate in effect at <br /> the time payment is made. This could result in higher fees. <br /> Construction Fleet Summary <br /> Since you have committed to use a clean construction fleet, you must submit a <br /> construction fleet summary to the District, per the enclosed Monitoring and Reporting <br /> Schedule, to verify construction emissions have been reduced by 20% for NOx and 45% <br /> for PM10. This analysis may result in additional processing fees. In the event that you do <br /> not achieve the required emission reductions, you will be invoiced for the remaining <br /> balance of emission reductions as required by Rule 9510. <br /> Change in Developer Form <br /> If all or a portion of the project changes ownership, a completed Change in Developer form <br /> must be submitted to the District within thirty (30) days following the date of transfer. <br /> Changes to Project <br /> The District's assessment of the project is based on the information provided in your AIA <br /> application and any supplemental documentation. Please be aware that changes to the <br /> project (e.g. change in land use type, use intensity, trip data, or other project-specific <br /> information) may require a revision of the assessment. You are required to notify the <br /> District of any changes to the project using the "Project Modification Request Form"found <br /> at http://www.vallevair.orq/ISR/ISRFormsAndApplications.htm. <br /> Additional Requirements <br /> • Dust Control Plan. Please be aware that you may be required to submit a <br /> Construction Notification Form or submit and receive approval of a Dust Control <br /> Plan prior to commencing any earthmoving activities as described in District Rule <br /> 8021 — Construction, Demolition, Excavation, Extraction, and Other Earthmoving <br /> Activities. <br /> • Asbestos Requirements for Demolitions. If demolition is involved, a Certified <br /> Asbestos Consultant will need to perform an asbestos survey prior to the demolition <br /> of a regulated facility. Following the completion of an asbestos survey; the asbestos <br /> survey, Asbestos Notification, Demolition Permit Release, and the proper fees are <br /> to be submitted to the District 10 working days prior to the removal of the Regulated <br /> Asbestos Containing Material and/or the demolition when no asbestos is present. <br />
The URL can be used to link to this page
Your browser does not support the video tag.