Laserfiche WebLink
Emissions Estimator Worksheet 04125/2024 <br /> Applicant/Business Name: Frank Spingolo Warehouse Company <br /> Project Name: PA-2200274 <br /> Project Location: 878 N. Golden Gate Avenue, Stockton, CA <br /> District Project ID No.: 20240032 <br /> Project ons ruC ion Emissions <br /> IF applicant selected Construction Clean Fleet Mitigation Measure-Please select"Yes"from dropdown menu Yes <br /> NOX PM10 Total Achieved OnSlte Reductions (tons) <br /> Unmitigated Mitigated <br /> Achieved Required Achieved Required <br /> Unmitigated Mitigated <br /> Project ISR Construction (q (s1 On-site ORsite Emission Reductions l�) (2) onslte Off-site Emission Reductions <br /> Phase Name Phase Start Date Baseline Baseline Reductional') Reductlonals) Required by Rulel6j Baseline Baseline Reductions(') Reductlonsl4) Required by Rule(s) ISR Phase NOx PM10 <br /> (TPY) (TPY) (tons) (tons) (TP1) (TPY) (tons) (tons) <br /> Phase 1-11.700 SF and Truck Parking 1 07/012025 0.7359 0.5887 0.1472 0.0000 0.1472 0.0322 0.0177 0.0145 0.0000 0.0145 1 0.1472 0.0145 <br /> 2 0.000D 0.0000 0,0000 0.0000 0.0000 0.0000 2 0.0000 0.0000 <br /> Phase 2-23.400 SF 3 07/01/2028 0.4293 0.3434 0.0859 0.0000 0.0859 0.0181 0.0099 0.0082 0.0000 0.0081 3 0.0859 0.0082 <br /> Phase 2-23.400 SF 4 01/01/2029 0.1748 0.1398 0.0350 0.0000 0.0350 0.0075 0.0041 0.0034 0.0000 0.0034 4 0.0350 0.0034 <br /> 5 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5 0.0000 0.0000 <br /> 6 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6 0.0000 0.0000 <br /> 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 7 0.0000 0.0000 <br /> 8 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 8 0.0000 0.0000 <br /> 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 9 0.0000 0.0000 <br /> 10 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 10 0.0000 0.0000 <br /> Total 1.3400 1.0719 0.2681 0.0000 0.2600 0.0578 0.0317 0.0261 0.0000 0.0260 Total 0.2681 0.0261 <br /> Project Operations Emissions (Area + Mobile) <br /> NOX PM10 Total Required Off-Site Reductions(tons) <br /> Total Average Total Average <br /> Achieved Required Annual Achieved Required Annual <br /> Unmitigated Mitigated Emission Unmitigated Mitigated Emission <br /> Protect ISR Operation Onslte Ofrsite Emission Onsite off-site Emission <br /> Baseline(1) Baseline(2) Reductions Baaelinell) Baseline('( Reductions ISR Phase NOx PM10 <br /> Phase Name Phase Start Date Reductions(') Reductions Required Reductions ReductionaP) Retluctione(q Reductions <br /> (TPY) (TPY) tons tons Required by Required h (TPY) (TPY) Required by <br /> (tons) (tons) Rule(°) y (tons) (tons) Rulers) Required by <br /> Rule01 Rule(7) <br /> 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 <br /> Phase 1 -11,700 SF and Truck Parking 2 01/012026 7.7528 7.7528 0.0000 19.3820 19.3820 1.9382 1.4360 1.4360 OAMO 7.1800 7.1800 0.7180 2 19.3820 7.1800 <br /> 3 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 3 0.0000 0.0000 <br /> 4 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 4 0.0000 0.0000 <br /> Phase 2-23,400 SF 5 D4/01/2029 0.1491 0.1491 0.0000 0.3728 0.3728 6.0373 0.2231 0.2231 0.0000 1.1155 1.1155 0.1116 5 0.3728 1.1155 <br /> 6 0.D000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6 0.0000 0.0000 <br /> 7 0.D000 0.0000 0.0000 O.ODDO 0.0000 0.0000 0.0000 0.0000 7 0.0000 0.0000 <br /> 8 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 8 0.0000 0.0000 <br /> 9 D.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 9 0.0000 0.0000 <br /> 10 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 10 0.0000 0.0000 <br /> Total 7.9019 7.9019 0.0000 19.7548 19.7548 1.9755 1.6591 1.6591 0.0000 8.2955 8.2955 0.8296 Total 19.7548 8.2955 <br /> Notes: <br /> TPY: Tons Per Year <br /> (1)Unmitigated Baseline: The project's baseline emissions generated with no on-site emission reduction measures. <br /> (2)Mitigated Baseline: The project's baseline emissions generated after on-site emisison reduction measures have been applied. <br /> (3)Achieved On-site Reductions: The project's emission reductions achieved after on-site emission reduction measures have been applied. <br /> (4)Required Off-site Reductions: The project's remaining emission reductions required by Rule 9510 if on-site emission reduction measures did not achieive the required rule reductions. <br /> (6)Emission Reductions Required by Rule: The project's emission reductions required (20% NOx and 45% PM10) for construction from the unmitigated baseline. <br /> (6)Total Emission Reductions Required by Rule: The project's emission reductions required (33.3% NOx and 50% PM10)for operations from the unmitigated baseline over a 10-year period. <br /> (7)Average Annual Emission Reductions Required by Rule: The project's total emission reduction for operations required by Rule 9510 divided by 10 years. <br />