Laserfiche WebLink
Environmental Health Department <br />Aboveground Petroleum Storage Act Inspection Report <br />Date: <br />April 26, 2022 <br /> Facility Address: <br /> 525 W ACACIA ST, STOCKTON <br /> Facility Name: <br /> DAMERON HOSPITAL <br />SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 721 □ V □ R □ COSFailed to provide corrosion protection for buried pipingCFR 112.8(d)(1) <br /> 722 □ V □ R □ COSFailed to cap/blank-flange connection at transfer point and mark its origin if not in serviceCFR 112.8(d)(2) <br /> 723 □ V □ R □ COSFailed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contractionCFR 112.8(d)(3) <br /> 724 □ V □ R □ COSFailed to regularly inspect aboveground valves, piping, and appurtenancesCFR 112.8(d)(4) <br /> 725 □ V □ R □ COSFailed to conduct integrity and leak testing on buried piping any time it is worked onCFR 112.8(d)(4) <br /> 726 □ V □ R □ COSFailed to adequately warn vehicles entering facility to protect piping and other transfer operationsCFR 112.8(d)(5) <br /> 727 □ V □ R □ COSPlan failed to adequately describe overfill prevention methods for each containerCFR 112.7(a)(1), <br />112.8(c)(8) <br />Other Violations <br /> 4010 □ V □ R □ COSUnlisted Administration/Documentation violation See below <br /> 4020 □ V □ R □ COSUnlisted Training violation See below <br /> 4030 □ V □ R □ COSUnlisted Operations/Maintenance violation See below <br /> 4040 □ V □ R □ COSUnlisted Release/Leaks/Spills violation See below <br /> 4050 □ V □ R □ COSUnlisted Abandonment/Illegal Disposal/Unauthorized Treatment violation See below <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />RemarksItem # <br />Overall Inspection Comments: <br />An inspection checklist was provided to the facility operator at the time of inspection. The inspector will provide <br />a complete report to the facility operator within the next few weeks. <br />Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br />documenting the corrective actions that have been or will be taken for each violation, and any supporting <br />paperwork, within 30 days of receiving the complete inspection report. <br />AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING <br />THIS FACILITY BACK INTO COMPLIANCE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Inspector Phone: <br /> FREDERICK ERNEST, REHS <br /> Inspector:April 26, 2022 Date: <br />Printed Name and Title: <br />Emailed report to; Denise Corkill, Dir. of Plant Ops & Maint <br />(209) 616-3026 <br />FA0002864 PR0526379 SC001 04/26/2022 <br />EHD 28-01 Rev. 12/06/2021 Aboveground Petroleum Storage Act OIRPage 4 of 4 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD