Laserfiche WebLink
Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> 10, TESTING AND MAINTENANCE Yes No NA <br /> Date last <br /> performed <br /> Has monitoring system certification been completed within the past <br /> 12 months? Z ❑ ❑ 2/15/22 <br /> Has spill container testing been completed within the past <br /> 12 months? ❑✓ ❑ ❑ 2/15/22 <br /> Has overfill prevention equipment inspection been completed within <br /> the past 36 months? ❑✓ ❑ ❑ 3/30/21 <br /> Has secondary containment testing been completed within the past -- <br /> 36 months? Ft/ ❑ ❑ 10/15/21 <br /> Has tank tightness testing been completed within required <br /> timeframes? ❑ I ❑ ❑✓ <br /> Has line tightness testing been completed within the required <br /> timeframes? ❑ I ❑ ❑✓ <br /> Other Test/ Maintenance: 1-10 0 <br /> Other Test/ Maintenance: ❑ ❑ <br /> Other Test/ Maintenance: ❑ <br /> 11. FACILITY EMPLOYEE TRAINING � _ �- _� <br /> ._ m = Yes No <br /> Have all individuals performing facility employee duties received the required facility <br /> employee training within the past 12 months? ❑ <br /> 13. COMMENTS <br /> Phis section may be used to record comments or observations that are not current compliance <br /> leficiencies. p ce <br /> a <br /> Aed <br /> to <br /> our <br />'saversZclrke�d-No�-mus`tbedescribed by the designated U <br /> ` 'ag <br /> ST operator in Section 3. <br /> PAnA n -r A .� <br />