My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2023 1:39:39 PM
Creation date
2/8/2023 1:40:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
AT&T CALIFORNIA - UE058
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />5. MONITORING SYSTEM AND PROGRAMMING <br />A separate Monitoring System Certification Form must be prepared for each control panel. <br />Make of Monitoring System <br />Control Panel <br />Model of Monitoring System <br />Control Panel <br />Software Version Installed <br />Veeder-Root TLS 350 121.00 <br />Attach the post-certification reports if the monitoring system is capable of generating Yes No NA either,- 121 Monitoring System Set-up el Alarm History Report <br />All monitoring equipment is operational per manufacturer's specifications? iLI <br />Secondary containment systems are free of damage, debris, or liquid? LI sr <br />Are the audible and visual alarms operational? LI i <br />All sensors have been: 1) visually inspected for wiring kinks, breaks and residual i <br />buildup on floats; and 2) tested for functionality and confirmed operational? <br />Are all sensors installed to detect a release at the earliest opportunity in the <br />secondary containment? <br />sr <br />The monitoring system set-up was reviewed, and proper settings confirmed? r <br />Was the monitoring control panel's backup battery visually inspected, functionally r <br />tested, and confirmed operational? <br />Does the flow of fuel stop at the dispenser if a release is detected in the under- <br />dispenser containment? El • 61 <br />Does the turbine automatically shut down if the piping secondary containment <br />monitoring system fails to operate or is electrically disconnected? 61 <br />Does the turbine automatically shut down if the piping secondary containment <br />monitoring system detects a release? Which sensors initiate positive shut down? ELI / <br />(Check all that apply) El Sump • UDC <br />If monitoring system alarms are relayed to a remote monitoring center, is all / <br />communication equipment operational? <br />Describe all answers marked "No" or "Fail" and proposed remedy in Section 9. <br />List all monitoring equipment either replaced or repaired in Section 9 <br />Page 2 of 6
The URL can be used to link to this page
Your browser does not support the video tag.