Laserfiche WebLink
Underground Storage Tank <br />Monitoring System Certification Form <br />8. IN -TANK GAUGING TESTING <br />® Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if NO tank gauging equipment is installed. Yes No NA <br />Do not complete this section if either box is checked. <br />All wiring has been: 1) visually inspected for kinks, breaks and proper entry and ® ❑ ❑ <br />termination; and 2 tested for ground faults? <br />Were all in -tank gauging probes visually inspected for damage and residue buildup ® ❑ ❑ <br />to ensure that floats move freely, functionallv tested, and confirmed operational? <br />Was accuracy of system's product level readings tested? ® ❑ ❑ <br />Was accuracy of system's water level readings tested? ® ❑ ❑ <br />Were all probes reinstalled properly? ® ❑ ❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? I N ❑ ❑ <br />Probe ID <br />Probe Model <br />Tanks Monitored <br />Pass <br />Fail <br />T-1 Diesel <br />VR -Mag -1 <br />T-1 Diesel <br />® <br />❑ <br />T-2 87 <br />VR -Mag -1 <br />T-2 87 <br />® <br />❑ <br />T-3 91 <br />VR -Mag -1 <br />T-3 91 <br />® <br />❑ <br />P0_j <br />❑ <br />9. COMMENTS <br />Describe all answers marked "No" or "Fail" and proposed remedy. <br />List all monitoring equipment either replaced or repaired. <br />Notes: <br />1. UDC'S are equipped with chains and floats. All Passed. <br />Emergency Shut -Off "ESO" Testing Results & Checklist: <br />Site Data: <br />How many ESO switches are present onsite? 1 <br />Performance Test: <br />1. Does the ESO shutdown power to dispensers? Yes ® No ❑ <br />2. Does the ESO shutdown power to the STPs? Yes ® No ❑ <br />Post Test: <br />Is site's fueling equipment operational? Yes ® No ❑ <br />Page 5 of 6 <br />