My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 1:40:11 PM
Creation date
2/9/2023 9:37:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if NO tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and ® ❑ ❑ <br /> termination; and 2 tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup ® ❑ ❑ <br /> to ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? ® ❑ ❑ <br /> Was accuracy of system's water level readings tested? ® ❑ ❑ <br /> Were all probes reinstalled properly? ® ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ® ❑ ❑ <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> T-1 Diesel VR-Mag-1 T-1 Diesel ® ❑ <br /> T-2 87 VR-Mag-1 T-2 87 ® ❑ <br /> T-3 91 VR-Mag-1 T-3 91 ® ❑ <br /> ❑ ❑ <br /> 9. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Notes: <br /> 1. UDC'S are equipped with chains and floats. All Passed. <br /> Emergency Shut-Off "ESO" Testing Results & Checklist: <br /> Site Data: <br /> How many ESO switches are present onsite? 1 <br /> Performance Test: <br /> 1. Does the ESO shutdown power to dispensers? Yes ® No ❑ <br /> 2. Does the ESO shutdown power to the STPs? Yes ® No ❑ <br /> Post Test: <br /> Is site's fueling equipment operational? Yes ® No ❑ <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.