Laserfiche WebLink
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />8. SUMP/UDC TEST <br />Test Method Developed by M Manufacturer ® Industry Standard ❑ Professional Engineer <br />Test Type ❑ Pressure ❑ Vacuum M Hydrostatic <br />Test Equipment Used: Triangle Manufacturing 5000w w/ + or — 0.002" graduations <br />Sump/UDC ID <br />T-1 87 STP <br />UDC #7-8 <br />Sump Manufacturer <br />Total <br />Containment <br />Bravo <br />Sump Depth (inches) <br />72" <br />12" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />28" <br />Piping enters <br />through <br />bottom of UDC <br />Test Start Time <br />7:53am <br />8:20am <br />Initial Reading <br />1.7775" <br />1.8940" <br />Test End Time <br />8:08am <br />8:35am <br />Final Reading <br />1.7779" <br />1.8933" <br />Change in Reading <br />+0.0004" <br />-0.0007" <br />Pass/Fail Criteria <br />+ or — 0.002" <br />+ or — 0.002" <br />Tightness Test Results <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Sump/UDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass Fail Criteria <br />Tightness Test Results <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 3of5 <br />