Laserfiche WebLink
Location:CGRS Project No : <br />Test Date: <br />CGRS Techs: <br />IOTA Tech Signature: <br />Sergio L. Nunez CA Tank Tester #06-1727 <br />Reviewed by: <br />Chris Murphy Director of CA Services <br />Secondary Flow Communication Test Certification <br />61-24608 <br />7-11 #41530 February 16, 2023 <br />1110 N. Main St.Sergio L. Nunez <br />Manteca, CA 95336 <br />COMPONENTS RESULTS <br />Piping Secondary Communication Confirmation <br />87 PL PASS <br />91 PL PASS <br />2/20/2023 <br />Date <br />DSL PL PASS <br />2/16/2023 <br />Date <br />VR PASS <br />DSL Vent PASS <br />87 Vent PASS <br />91 Vent PASS <br />CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed <br />throughout the secondary piping components listed below.