My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2802
>
2300 - Underground Storage Tank Program
>
PR0516736
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:42:26 PM
Creation date
2/14/2023 1:57:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0516736
PE
2361
FACILITY_ID
FA0012764
FACILITY_NAME
SAFEWAY FUEL CENTER #1769
STREET_NUMBER
2802
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2802 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\bmascaro
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISIONS <br /> coDNG> CONSTRUCTION NOTES: S S COUNTRY CLUB BOULEVARD <br /> FUEL SYSTEM INSTALLATION 7. <br /> R R R <br /> O <br /> TANK TOP: <br /> Fl <br /> 1. INSTALL THREE 137 NEW SADDLE CUT SIN LLE-WALL STP TANK SUMPS. o <br /> 2. INSTALL SIX (6) NEW OM EDGE DOUBLEWALL 5 GALLON SPILL CONTAINERS THREE PI FOR THE <br /> FILL CONNECTIONS, AND THREE D) FOR THE STAGE I VAPOR CONNECTIONS. <br /> 13 3. INSTALL OVERFILL PREVENTION FLAPPER VALVE IN THE F1 LL RISERS. <br /> O 4. INSTALL FOUR M) NEW FE PETRO VARIABLE SPEED PUMPS. <br /> I Fb u, \ I S. INSTALL NEVI STAINLESS STEEL PRODUCT PIPING, FIEX CONNECTORS. BALL VALVES, ADAPTERS <br /> AND 6. INSTALL THREE (3N EW EMCO WHEATON COMPOSITE STUDING NEW TILM PROBE RISERS AND P THREE (3) TANK SUMPS. <br /> MANHOLES. <br /> \\ ]. INRI NEW UWTH TV ST IRON MANHOLES COMPOSITE UDS FOR TANK INTERSTITIAL <br /> I 45 12 \ DISPENSERS. g t <br /> SLOPEAULPIPING <br /> 110' PER FOOT 16 11 \ B. REINSTALL EIGHT (a) EXISTING DISPENSERS DISPENSER INSTALLATION AND STARTUP SHALL BE w IS B <br /> BACKTDTAMK6 I \ UNDER SEPARATE CONTRACT. O <br /> 9. INSTAEIGHT (8) NBRAVO SINGLE WALL FRP DISPENSER SUMPS. INSTALLLL NEV?STABILCER 2 O <br /> LL EW <br /> 3.1 DISPENSER C BARS, SHEAR VALVES. AND FLEX CONNECTORS FOR EACH DISPENSER N Ima <br /> low <br /> — PIPINGNENTS <br /> _r 151 ITTP. OF 21 10. INSTALL NEW]'FISP SINGLE WALL STAGE 11 VAPOR RECOVERY PIPING FROM STAGE VAPOR SPILL <br /> I 1 � o� R_p_T_puoo4op� �AN ON <br /> PTO LAN. SUMPSINALL3' FRP SINGLE WALL VAPORRECOVERY PIPING MMERE <br /> I I. INALL NEw 3.OVER Y FAP DOUBLE WALL PRODUCT PI%NG FROM NEW STP SUMPSTO <br /> NI DISPENSER P ® Ip II T3: 19K Dan I 1 DISPENSER SUMPS Q <br /> ,1 13, INSTALL NEW I FgENT RISE WALL VEM PI%NG FROM TANK SLMPS TO VENT MSEgS. <br /> I j ^I I I 13, INBTALL 191 NEWVEM fl19ER5 ANO CAPS. <br /> I d ^ O cap ❑2 I I I DO I I I ELECTRICAL <br /> 1}}1 j1I WN <br /> 4. ER <br /> EXISTING ELECTRICAL SHALL BE REUSED EXCEPTE NEW SUMPS ARE INSTALLED. <br /> B I ZY6 I I I 1 THE EXMITING CONDUITSSMALL BE CUT BACK VATHIN THE DEMOLITION OMITS AND REPIACED. THE <br /> CONYAEfE <br /> ie FIRSTS' OF EACH CONDUIT BEYOND THE SUMP WALL EXTERIOR SHALL BE PVC COATED RMC T <br /> 2011 <br /> BEFORE CONVERTING TO PVC.ALL SEAL OFF FITTINGS SHALL BE INSTALLED IN THE VERTICAL AND <br /> SODJUNCTION BOXES SHALL BE EXPLOSION PROOF. <br /> I 3 I Z I ' 1210N PREMIUM 15. EXISTING POWER WIRING AT TANKS AND DISPENSERS SHALL BE TESTED AND REUSED, OR <br /> m <br /> REPLACED IF FOUND IN MDR CONDITIONS. m U <br /> vi DO 16. REPLACE EXISTING DATA CABLE WITH CATS CABLE U <br /> 17. EXISTICETLS�M TANK T <br /> OR SHAtJL REMAIK 2F <br /> 16. REPLACE EXISTING SENSORS AND PROBES. EXISTING INTRINSICALLYWI <br /> SAFE SENSOR RING SHALL T O <br /> BE REUSED. SENSOR HARING SHALL BE SEMEN CABLE PER VEEDEgSOOT INSTALLATION MANUAL ? te <br /> i6 T 156 M 19. TWO EXISTING ESTOP DISCONNECT SVBTCHESTO REMAIN. i <br /> Lu <br /> ® i PAVEMENT: O w <br /> a le 31 © I 1p ^ ^ 1 1 5 6 STP SUMP r < M SACKFUL EXCAVATION WITH PREVIOUSLY EXCAVATED MATERIALS. PREVIOUS EXCAVATED o <br /> 3 II 11 LA 15 1B mP. CA3) MATERIALS STULL BECLEANEDTO gEMOVEANY CLUMPS, CRUSHED STONE LARDER THAN V7 AND <br /> II I i PEA GRAVEL LARGER THAN W4• PER PIPING MANUFACTURER SPECIFICATIONS. <br /> EXISTING OVERFILL I I I u 21. INSTAL REBAR AND RESURFACE DRIVE SLAB AND TANK SLAB CONCRETE TO MATCH EXISTING, H <br /> MAMNAYS TO BE SET WITH T CONCRETE CROWN AT 24. OFF EDGE SEE SHEET FT4 FOR DETAILS <br /> AC NOWLIDGMENT I I ' Y< <br /> INSTAL- ASPHALT SURFACES TO MATCH EXISYING, MERE AFFECTED. SEE SHEET FTd FOR <br /> Z AA OT z I ESTOP 19 SWITCH I ® ` 23. INSTALL SELF- EVEUNG JOINT SEALANT AT ALL CONSTRUCTION JOINTS <br /> 1 I I POSTINSTALLATION. <br /> 4. TWD 12) EXISTING FIRE EXTINGUISHERS TO REMAIN VERIFY EXTINGUISHER TO HAVE A MINIMUM <br /> I I RATING OF 2A20.6 C. FIRE EXTINGUISHER IS LOCATED NOT MORE THAN ?5 FEET FROM PUMPS, <br /> EXISTING x CLEADISPEN UP S OR THE <br /> ESTE AND STORAGE TANK FILL-PIPECONSTRUCTION <br /> I{—Tw., SWSKY I I ' AF UP AREAS. AND REMOVE ALL CDNSTRUC110N DEBRIS, INCLUDING LOT SNEE%HOOF rpv l` yam, <br /> Q / tT 18 25 26 2] FILL AND STAGE 36. PERFORM FULL <br /> NHANCE LEAK ETETEMCFRTIFlCATONANDSTARTLP VAPOR RECOVERY TESTING, <br /> L. Otr4 / . <br /> I- \� �n I II 2 3 SPILL CONTAINER I PERFORM ENHANCED LEAK DETECTION (EIDE <br /> (n — _ _ _ _ _ _ _ — _ 501502 BIG 504505 596 I IttP. DF3) I 5 2>. COORDINATEALL REQUIgED MSPECTONS WfIH JURISOILTLONAUTHgiITESANOTHIR6PARTY F <br /> _ INSPECTORS eV <br /> urn 156 ] Tl. MK REGULAR ISLANDS. <br /> r I y ur 2B. INSTALL EIGHT IM NEW ISLANDS. 44 <br /> tm <br /> I � I / I i MISCELLANEOUS NOTES: <br /> 19 ESTOP Ij , 1. OWNER DESIGN REOUIREIAENTSSINLL BE FOLLOWEDEVENIF THEY EXCEED LOCALAND STATE <br /> / REQUIREMENTS. N U <br /> I IAmuaT ua 2 GENDMRDURUTIESINPROXIMIWOFMRKAREASHOWN. CONTRACTORSHALLLOCATEALL Z <br /> UNDERGROUND UTIUTIES PRIOR TO EXCAVATION <br /> / 24 M 1j B 3. SOIL SAMPLINGAS REQUIRED BYCUPAANN OTHER AHJ'S. CONTRACTORTOVERIFY. Q <br /> B 9 1 15 / t❑1 ❑B I I 1 Ut <br /> I ITYP. OF B) 16 1B 2B _ ~ <br /> - - - e l I I I - R - REGULAR GASOLINE PRODUCT %PMG Z O <br /> / ^ ^ ^` I I — P — PREMIUM PRODUCT PIPING G Q >Q <br /> / :` A — 0 — DIESEL PRODUCT PIPING W J <br /> / I LP Y — V — VENTPIPIPPIING � 11, 2 <br /> RRECCOVERYY PIPING O <br /> I I / ^ 2 ASPHALT PIPINGSLOPEARRCXSPING <br /> DISPENSER FUELING POSITION NUMBER p`Q Z 1- <br /> II W Z <br /> O <br /> I I e I I Flip PIPE SHALL HAVER MINIMUM OF I. OFSTRAIGHI PIPE OUTSIDE OF SUMPS 4W <br /> .1 BFFOREA DIRECTIONAL CHANGE PER ALBEFTSONS SPECIFICATIONS. <br /> ENSE6) <br /> DIAMONDZ ENGINEERING, INC. <br /> II I � am 96 d 5M STATE ROAD <br /> � -_====- RJLA N <br /> 9GLE •DATE~• <br /> EXISTING CANOPY Y 1' • 1C 12M8^m22 <br /> I j I 010 ORA A BY: PROrJ�EC1�11.G.: <br /> 1INCH= IOFEET <br /> DRAWING NO. <br /> � � - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - � F-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.