Laserfiche WebLink
REVISIONS <br /> OSEE NOTES ON SHEET FT-1 NOTES : p LL <br /> OSEE SHEET FM-t 1. VERIFY PROPER ORIENTATION OF THE SUMP PRIOR TO FORCING SUMPS TO MOUNTING COLLAR. ry a g <br /> O FOR REGULAR ONLY 3 R 2 <br /> RST INSTALL POLYGON SUMP RISER TO TANK MOUNTING COLLAR PER MANUFACTURER INSTRUCTIONS. THEN GLASS WRAP <br /> AMINATE THE ENTIRE OUTSIDE OF PERIMETER OF THE BOTTOM CONNECTION FOLLOWING CURING OF ADHESIVE SPECIFlCA _ <br /> ATTENTION MUST BE GIVEN TO SURFACE PREPARATION, FIBERGLASS MAT FAUST BE C WIDE MINIMUM AND MUST EXfrND in" <br /> BEYONOCOVERAGEDFADHESIV . <br /> 3. FIRST INSTALL SUMP LID TO POLYGON SUMP RISER PER MANUFACTURER INSTRUCTIONS. THEN GLASS WRAP S LAMINATE THE <br /> ENTIRE INSIDE AND OUTSIDE PERIMETER OF THE TOP CONNECTION FOLLOWING CURING OF ADHESIVE SPECIFIC ATTENTION <br /> MUST BE GIVEN TO SURFACE PREPARATION. FIBERGLASS MAT MUST EXTEND tn' BEYOND COVERAGE OF ADHESIVE- <br /> FIELD <br /> DHESIVEFIELD SEALED JOINT <br /> IAOHESIVE SUPPLIED <br /> WiTHSUMPI <br /> ,pO] FOR REGULAR Q 4 a m <br /> OR <br /> tOOe FOR PREMIUM IOit FOR REGULAR AND PREMIUM <br /> OR 7 OR <br /> 109 OR DIESEL UM <br /> qFORDIEEYL((51Bm) <br /> 2 FOR DIESEL _ MINIMUM26 tOFOR ftEGUTAR ANDOR <br /> OFOR REGULAR OFOR \ UA FORPREMIUMOR OR FIELD SEALED JOINT T p <br /> (ADHESIVESUPPLIED <br /> TANK) 0 <br /> WITH TANK) ■ ■ . <br /> t]9 FOR DIESEL W z O <br /> 121 <br /> 121 0 <br /> LL O <br /> - � N <br /> 6" HOPE CORRUGATED - COLLAR BONDED TO TANK <br /> CHASE PIPE <br /> FIELDSEALEOJ <br /> J66 (ADHESIVE SUPPLIEPLIE <br /> D WITH SUMP) <br /> 6- HOPE CORRUGATED RU —� <br /> EPIPE lY1 <br /> �C SUMP CONNECTION <br /> COATNT CORROSION TO V SCALE: t" = t'-P <br /> PREVENT CORROSION <br /> 156 T 3- MINIMUM `( <br /> ^ : <br /> COAT <br /> FITTING CONNECTION TO • n ' <br /> PREVENTCORROSION <br /> 537 <br /> is ns <br /> N U <br /> Z <br /> 125 <br /> u O U <br /> Z Z_ <br /> CONDUIT <br /> W <br /> W <br /> Z <br /> COAT FITTING CONNECTION <br /> TO PREVENT OOS <br /> Z W <br /> ® W n- <br /> 0 <br /> a <br /> F- <br /> DIAMOND Z ENGINEERING INC. <br /> D670 STATE ROAD <br /> 555 <br /> SG1LE � DATE <br /> ,u,6no� <br /> AwFBrROJEcr ND.: <br /> A <br /> TANK FILL STAGE 1 VAPOR RECOVERY ��1 INTERSTITIAL SPACE MONITOR DRAW NG oda 3 <br /> Et' o E , , -0 v S • FT-3 <br />