Laserfiche WebLink
S JCOG, Inc . <br /> 555 East Weber Avenue • Stockton, CA 95202 • (209) 235-0600 • FAX (209) 235-0438 <br /> 17 Sall Joaquin Coi. nhj Multi - Species Habitat Conseivatiou & Open Space Plan (SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION ( RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG, Inc . <br /> To : Nancy Arroyo , San Joaquin County, Community Development Department <br /> From : Laurel Boyd , SJCOG , Inc . Phone : (209) 235- 0574 Email : boyd@sjcog . org <br /> Date : February 14 , 2023 <br /> Local Jurisdiction Project Title : PA-2300018 (VR) <br /> Assessor Parcel Number(s ) : 086-540- 19 <br /> Local Jurisdiction Project Number: PA-2300018 (VR) <br /> Total Acres to be converted from Open Space Use : Unknown <br /> Habitat Types to be Disturbed : MultkPurpose Open Space Habitat Land <br /> Species Impact Findings : Findings to be determined by SJMSCP biologist . <br /> Dear Ms . Arroyo : <br /> SJCOG , Inc . has reviewed the application referral for PA-2300018 (VR) . This project consists of a Variance application to reduce <br /> the minimum lot size in the AG-40 (General Agriculture , 40-acre minimum) from 40-acres to subdivide an existing 31 . 08-acre parcel into a <br /> 2-acre parcel . The project site is on the north side of E . Ratto Road , 2 , 000 feet northeast of N . Hildreth Lane, East of Stockton <br /> (APN/Address : 086-540-19 / 7821 E . Ratto Road , Stockton ) . <br /> San Joaquin County is a signatory to San Joaquin County MultkSpecies Habitat Conservation and Open Space Plan <br /> ( SJMSCP ) . Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts and <br /> ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental Quality <br /> Act ( CEQA) . The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP . Although participation in the SJMSCP is voluntary , Local Jurisdiction / Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP , they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP . <br /> At this time, the applicant is requesting a Variance with no ground disturbance . Any future ground <br /> disturbing activities (e. g. roads, curb, gutter, electrical, water, etc .) or any physical structures that <br /> require ground disturbance on this or subsequent divided parcels will be subject to participate in the <br /> SJMSCP before ANY ground disturbance occurs and should be resubmitted to this agency. Current or <br /> future owners of this- or subdivided properties should be made aware of the conditions that are placed <br /> by the SJMSCP on future development on the created parcels. <br /> This Project is subject to the SJMSCP. This can be up to a 30 - day process and it is recommended that the project <br /> applicant contact SJMSCP staff as early as possible . It is also recommended that the project applicant obtain an information <br /> package . http : //www . sicog . org <br /> Please contact SJMSCP staff regarding completing the following steps to satisfy SJMSCP requirements : <br /> ■ Schedule a SJMSCP Biologist to perform a pre - construction survey prior to any -ground disturbance <br /> • SJMSCP Incidental Take Minimization Measures and mitigation requirement : <br /> 1 . Incidental Take Minimization Measures ( ITMMs) will be issued to the project and must be signed by the project applicant prior to any <br /> ground disturbance but no later than six (6 ) months from receipt of the ITMMs . If ITMMs are not signed within six months, the applicant <br /> must reapply for SJMSCP Coverage . Upon receipt of signed ITMMs from project applicant, SJCOG , Inc . staff will sign the ITMMs . This <br /> is the effective date of the ITMMs . <br /> 2 . Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs . <br /> 3 . Upon issuance of fully executed ITMMs and prior to any ground disturbance , the project applicant must : <br /> a . Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered ( the bond <br /> should be valid for no longer than a 6 month period ) ; or <br />