My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2023 2:49:20 PM
Creation date
2/22/2023 11:03:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />the COMMENTS section. <br />Page 3 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Caldwell Level Change Indicator <br />Sump/UDC ID 1-87-PS 2-Diesel-PS 3-91-PS <br />Sump Manufacturer Western FG Western FG Western FG <br />Sump Depth (inches) 56" 55" 55" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />14" 19" 19" <br />Test Start Time 10:20 10:15 9:27 <br />Initial Reading .001 .001 .001 <br />Test End Time 10:50 10:45 9:57 <br />Final Reading .001 .001 .001 <br />Change in Reading 0 0 0 <br />Pass/Fail Criteria > .002 > .002 > .002 <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Sump/UDC ID UDC 1&2 UDC 3&4 UDC 5&6 UDC 7&8 <br />Sump Manufacturer Bravo Bravo Bravo Bravo <br />Sump Depth (inches) 9" 9" 9" 9" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />BP BP BP BP <br />Test Start Time 9:37 9:32 9:42 9:47 <br />Initial Reading .001 .001 .001 .001 <br />Test End Time 10:07 10:02 10:12 10:17 <br />Final Reading .001 .001 .001 .001 <br />Change in Reading 0 0 0 0 <br />Pass/Fail Criteria > .002 > .002 > .002 > .002 <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br /> <br />8. SUMP/UDC TEST
The URL can be used to link to this page
Your browser does not support the video tag.