Laserfiche WebLink
<br /> <br /> <br />the COMMENTS section. <br />Page 3 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Caldwell Level Change Indicator <br />Sump/UDC ID 1-87-PS 2-Diesel-PS 3-91-PS <br />Sump Manufacturer Western FG Western FG Western FG <br />Sump Depth (inches) 56" 55" 55" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />14" 19" 19" <br />Test Start Time 10:20 10:15 9:27 <br />Initial Reading .001 .001 .001 <br />Test End Time 10:50 10:45 9:57 <br />Final Reading .001 .001 .001 <br />Change in Reading 0 0 0 <br />Pass/Fail Criteria > .002 > .002 > .002 <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Sump/UDC ID UDC 1&2 UDC 3&4 UDC 5&6 UDC 7&8 <br />Sump Manufacturer Bravo Bravo Bravo Bravo <br />Sump Depth (inches) 9" 9" 9" 9" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />BP BP BP BP <br />Test Start Time 9:37 9:32 9:42 9:47 <br />Initial Reading .001 .001 .001 .001 <br />Test End Time 10:07 10:02 10:12 10:17 <br />Final Reading .001 .001 .001 .001 <br />Change in Reading 0 0 0 0 <br />Pass/Fail Criteria > .002 > .002 > .002 > .002 <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br /> <br />8. SUMP/UDC TEST