Laserfiche WebLink
Underground Storage Tank <br /> Designated UST Operator\usual Inspection Report <br /> - -- tNA Date last <br /> 10. TESTING AND MAINTENANCE performed <br /> Has monitoring system certification been completed within the past9/ 0/701 <br /> 12 months?es spill container testing b®en completedwithin the past 0/30/2021 <br /> 12 months? <br /> Hes overfill prevention equipmenit inspection been completed withinthe past 36 months? 5ld/�01 <br /> as secondary containment tting been completed within the past <br /> 36 months? 8/18/2021 <br /> Has tank tightness testing been Completed within required <br /> timeframes? ❑ ❑ <br /> Has line tightness testing been coir Pletedwithin the required <br /> timeframes? ❑ ❑ ❑ <br /> Other Test/ Mziintenance: — ❑ El 0 <br /> Other Test J Maintenance: <br /> Other Test-/ - -- -ri <br /> - -- ---- -- <br /> '11: 1-AU ITY EMPL67 TRAINING ❑ © ❑ <br /> Have all individuals performing facility employee duties received the required favi i Yes No <br /> employee training within the past tri months? I ty <br /> 13. COMM€NT; 0 ❑ R, <br /> a. <br /> This section maybe - - -- <br /> used to record c©mments or o,bse/nations that are not cr�rrgnt <br /> deficiencies. compliance <br /> h'answers marked -- _ <br /> IVo must be described by the design UST <br /> opernt".• _ ---_-_ <br />