My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
2300 - Underground Storage Tank Program
>
PR0231092
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 5:13:57 PM
Creation date
2/23/2023 11:45:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231092
PE
2361
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
01
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Inspection Re>P°� <br /> Designated UST Operator Visualpate last <br /> Yes No NA performed <br /> 1 �monitodlng <br /> G AND MAINTENANCE ❑ 9/30/2021 <br /> s stem certification been completed within the past 0Has y ❑ 9/30/2021 <br /> 12 months? ✓ <br /> Has spill container testing been completed within the past <br /> 12 months? ❑ ❑ 5/4/2021 <br /> Has overfill prevention equipment insp <br /> ection been completed within 0 <br /> the past 36 months? 8/18/2021 <br /> Has seconds containment testing been completed within the past � ❑ ❑ <br /> Ha rY <br /> 36 months? ✓❑ <br /> Has tank tightness testing been completed within required [] ❑ <br /> timeframes? <br /> ❑ ✓ <br /> Has line tightness testing been completed within the required El <br /> timeframes? ❑ ❑ ❑✓ <br /> Other Test/ Maintenance: ❑ ❑ <br /> Other Test/ Maintenance: El ❑ ❑ <br /> Other Test/ Maintenance: <br /> Yes No <br /> 11. FACILITY EMPLOYEE TRAINING <br /> ❑ ❑ <br /> Have all individuals performing facility employee duties received the required facility <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> g <br /> All answers,marked"No"must be described by the designated UST <br /> Operator in Section 3 <br /> page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.