Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if NO tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and 0 0 0 <br /> termination; and 2 tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup ❑ ❑ <br /> to ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> ❑ 0 <br /> 0 0 <br /> ❑ 0 <br /> ❑ IM <br /> 9. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> During MSC after cold start, <br /> Replaced the DSL WEST HI FLO STP liquid sensor due to damaged wiring coming out of the <br /> top of the sensor. <br /> Unable to turn the DSL WEST HI FLO pump on. Was told by an H&S employee that during the <br /> software upgrade, the manual switch in the control room to switch over from AST to UST for <br /> the truck stop was removed. The programming in the pump sensor setup is set for tank #4 but <br /> could not find anything for tank #3 which would be the DSL west UST. <br /> Sensor for the DSL west UST sends alarm to TLS-350 but unable to verify positive turbine <br /> shutdown. <br /> Completed all other testing with passing results. <br /> Page 5 of 6 <br />