My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1616
>
1600 - Food Program
>
PR0162643
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 4:14:36 PM
Creation date
3/2/2023 3:43:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0162643
PE
1619 - RETAIL MKT >1000 SQ FT (=/>2 DEPTS)
FACILITY_ID
FA0001709
FACILITY_NAME
COCOS FOOD - STOCKTON
STREET_NUMBER
1616
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\ymoreno
Supplemental fields
Site Address
1616 E MARCH LN STOCKTON 95210
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fan and Heater Circuits- Electric Defrost (standard) <br /> Low Temperature <br /> CIRCLED NUMBERS=PARTS LIST ITEM NUMBERS <br /> R=Rcd P=Purple 2P=Purplc(2 Bands) DB=Dark Blue BK=Black <br /> LB=Light Blue BR=Brown Y=Yellow OR=Orange W=White <br /> THESE ARE MARKER COLORS <br /> 205v t / i 208V CAUTION:When multiplexing <br /> FAN RE—LAY col merchandisers equipped with <br /> F 4 defrost heaters,if branch circuit <br /> overcurrent protection is larger <br /> _���T than the individual merchandiser's <br /> 2 8 defrost circuit load,then <br /> FRONT DEFROST 8 O additional supplemental <br /> 3 4 overcurrent protection may be <br /> DETI required per NEC Articles 210 and <br /> 6 �T 5 240. <br /> 00R <br /> O EAM <br /> 120 V FAN if <br /> F FANS O <br /> 26 <br /> 14 F pODHEATERaRAN Refer to Innovator Reach-In <br /> NO 5 Class Door,Installation and <br /> Service manual,PIN 0425683, <br /> 9 2 for Innovator door and frame <br /> DASH replacement parts <br /> coNTROILM <br /> 16 tea NEUTRAL <br /> FAME AS <br /> 13 — <br /> ----------------NV� ---— -- 2 <br /> IEArEA NEUTRAL <br /> DASH DASH <br /> CDN <br /> 12 ooaa AS CONTROLLM <br /> �h�hgAP21 <br /> 1120% NEUTRAL] <br /> LNHT5 <br /> SIOTT `, 3024448_C <br /> 17 <br /> ;V � <br /> FIELD WIRED <br /> DEFROST IEPJANAnON nfAMOSTA1 <br /> �cOA <br /> THE HEAVY LINES DRAWN INSIDE <br /> THE TERMINAL BLOCKS REPRESENT <br /> PERMANENT INTERNAL JUMPERS. <br /> 1 2 3 4 5 6 7 8 10 I 112 13 4 1 17 20 21 22 24 25 6 <br /> THE HEAVY LINES DRAWN OUTSIDE <br /> THE TERMINAL BLOCKS REPRESENT <br /> REMOVABLE EXTERNAL JUMPERS. <br /> Electric Defrost Sequence-Low Temperature <br /> 1. Power from the defrost contactor energizes Defrost Heaters and 208V Evaporator Fan Relay Coil(7). Relay Contacts open <br /> the fan circuit and energizes the Drain Pan Heater. <br /> 2. If the Defrost Heater raises internal air temperature above 90a17,the Defrost Limit Thermostat(4)will open. <br /> 3. When Defrost Termination Thermostat ends defrost period,the defrost contactor opens the Defrost Heater and Evaporator <br /> Fan Relay Coil Circuits. The Drain Pan Heater goes off and fans are on. <br /> 4. Standard low temperature Reach In cases with Innovator I doors are shipped with the DASH controller for door anti-sweat <br /> heater control installed. Do not connect the DASH controller input to a centralized anti-sweat system. It must be connected <br /> to a continuous 120V circuit for proper operation. <br /> 5. If the case is connected to a centralized anti-sweat controller that meets DOE compliance requirements,the DASH controller <br /> is not installed on the case. Feed the 120V controller output into terminal#12. <br /> 6. Options may be installed that have additional or replacement wiring diagrams. <br /> 7. Reach In cases with Innovator III doors do not have the DASH controller. <br /> 6 of 7 U.S.&CANADA 1-800-922-1919•MEXICO 1-800-890-2900 RLN with Innovator Doors or Innovator III Doors <br /> Technical Data Sheet <br /> Equip #2, 3 -Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.