Laserfiche WebLink
Complaint Investigation Summary Report #: 5105 <br />COMPLAINT ID: COEBXNBJK Site Location: 1612 FIRST Si ESCALON, CA <br />Activity Summary <br />Activity Date Recorded by <br />10/03/2022 Arrived back on site to verify clean up. PSC applied absorbent sand around the PRESTO <br />transformer and pumped out oil remaining inside the transformer. The transformer <br />was replaced by PG&E and PSC continued clean up. Area surrounding the <br />transformer was cleaned by PSC with absorbent sand and soil was excavated <br />around the concrete. Additional staining of oil was observed under the concrete <br />pad. Met with Celia Barajas, Environmental Field Specialist, PG&E who will update <br />EHD on remediation plan for oil under concrete. Notice to abate written and <br />ennailed to Celia <br />Called Escalon School District Superintendent to let them know about the release <br />from earlier this morning. <br />Printed notice to abate and email. <br />10/04/2022 Generated photo log, contact sheet and full page photos. Printed and placed in PRESTO <br />file. <br />10/05/2022 Generated site map and ER01. Printed and placed in packet PRESTO <br />10/20/2022 Emailed Celia Barajas to follow up on sample results and clean up plan PRESTO <br />10/21/2022 Received email from Celia Barajas with sample results showing PCB non-detect. PRESTO <br />She also said that they are making arrangements with the property owner and <br />coordinating shut down and a crane may need to be brought in to lift the <br />transformer and concrete pad. May take two weeks to complete coordination then <br />the hazardous materials crew can be scheduled out to do excavation. Requested <br />Celia update me on the date so we can witness final clean up. <br />10/24/2022 Discussed with lead senior sample results. Emailed Celia to verify that the sample PRESTO <br />results are for 1612 First St Escalon as the results say 1612 First St Oakdale. <br />Received email from Celia that sample results are for Escalon. <br />11/22/2022 Received email from Celia Barajas, PG&E that "The job is scheduled for 12/2". PRESTO <br />Emailed her back if she knew what time and if PSC will be continuing the clean up. <br />11/23/2022 Received email from Celia Barajas, clean up with PSC on 12/2/2022 at 8:00am. PRESTO <br />12/02/2022 Received email from Celia Barajas that the clean up today was canceled and she PRESTO <br />will let me know when the new date comes. Emailed her back confirming I <br />received the cancellation. <br />01/18/2023 Emailed Celia Barajas to check in on clean up status. Received email from Celia PRESTO <br />that clean up is scheduled 1/27/2023. Emailed her back to check in on time and <br />contact information for PSC. <br />01/30/2023 Discussed with lead senior that I forgot their scheduled clean up was 1/27/2023. PRESTO <br />Updated lead senior after phone call with Celia Barajas. Updated lead senior after <br />email from Celia received. <br />5105. rpt <br />Page 2 of 3