My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
717
>
2300 - Underground Storage Tank Program
>
PR0522448
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2024 3:45:10 PM
Creation date
3/8/2023 9:15:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0522448
PE
2371
FACILITY_ID
FA0015274
FACILITY_NAME
KESAR PETROLEUM INC
STREET_NUMBER
717
Direction
W
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16314045
CURRENT_STATUS
01
SITE_LOCATION
717 W EIGHTH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IEC <br /> SERVICES <br /> 4901 Warehouse Way , Sacramento , CA 95826 <br /> 800 -87&9274 <br /> CSLB# 1064168 and 164168 <br /> February 27 , 2023 <br /> Customer Contact Information : <br /> Owner : Aakash Patel — Kesar Petroleum <br /> Phone : 408 -329 - 8089 <br /> Email : kesarpetroleuminc(ftmail .com <br /> Site Address : <br /> 717 W 81h St <br /> Stockton CA 95206 <br /> Contractor : <br /> IEC Services <br /> 4901 Warehouse Way, <br /> Sacramento , CA 95826 <br /> CA . Lic # 1064168 <br /> Contact : Kurt Ramont <br /> Phone : 916- 993 - 6312 <br /> Scope of Work <br /> The following tasks are included in this quotation : <br /> • Fees and Labor to obtain AQMD and Environmental Health department permits . <br /> • Labor to disconnect and dispose of Six ( 6 ) existing Gilbarco Encore 300 Dispensers . <br /> • Install Four (4 ) 3 +0 and two ( 2 ) 3 + 1 Gilbarco Encore 700S Dispensers . <br /> • Install Bravo Conversion Frames . ( if required ) <br /> • Reconnect piping and conduit for fuel , vapor and electrical lines . <br /> • Purge air out of dispensers , calibrate dispensers , complete weights and measures " Place into Service " <br /> procedures . Complete startup of new equipment . <br /> • Keep existing Balance Vapor recovery system . <br /> • Install Isolation Boxes ( if needed ) <br /> • Configure and test all Veeder- Root sensors <br /> • Upgrade and grade map Veeder Root . <br /> • Upgrade Gilbarco Passport Combo Manager/ Cashier Workstation <br /> • Complete Applause and EMV upgrades on newly installed dispensers . <br /> • Complete Monitor Certification with local CUPA inspector . <br /> • Complete full Air Quality testing with local Air District <br /> Consulting • Sales • Installations • Service <br /> Electrical • HVAC • Refrigeration • Compressors • Pumps & Motors • Car Wash • Security Cameras • Networking <br /> Underground Storage Tanks • Fueling Dispensers • Fuel Station Compliance and Testing • POS Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.