Laserfiche WebLink
UTILITY PLAN NOTES: <br /> 1. Contractor To Coordinate With Facility Manager For <br /> Construction Phasing. <br /> 2. See Sheets CU-501 To CU-502 For Utility Details. <br /> 3. SJ County Details Below are Per San Joaquin <br /> County Public Works Improvement Standards <br /> Current Version(November 2014). <br /> 4. Thrust Blocks Per SJ County W-6. <br /> 5. Provide Utility Separation Per SJ County W-10. <br /> 6. Onsite Wastewater Treatment System Shall Be Per <br /> The San Joaquin County Onsite Wastewater <br /> Treatment Systems Standards(January 2017). <br /> 7. Leach lines shall be 4"PVC perforated pipe.Filter <br /> material shall be graded and washed rock or <br /> approved material.The Filter bed shall have <br /> minimum depth of 12"filter material under the <br /> perforated pipe and a maximum depth of 42".2"of <br /> filter material to cover the perforated pipe covered <br /> with untreated paper,filter fabric,straw,or other <br /> a o <br /> approved material poor to backfill. <br /> A street UTILITY PLAN KEYNOTES: <br /> The Key Notes Below Apply To This Series Of Sheets.Each <br /> Track 709 Key Note May Not Be Used On This Specific Sheet. <br /> Track 706 1❑ 10"PVC(C-900)Water Line. <br /> Track 7072❑ 2"Type K Copper Water Service Installation Per SJ <br /> Track 708 County W-1. <br /> 3❑ Reduced Pressure Backflow Preventer. <br /> ® Hot Tap Connection. <br /> Cl) Track 169 LO ❑5 Irrigation Meter,See Irrigation Plan. <br /> Mainline © Sanitary Sewer Cleanout Per SJ County S-3 and S-5. <br /> U U <br /> ZO Track 101 Z O ❑7 Subsurface Septic Dispersal Field.94.5 LF Leach <br /> Z Zi Z Line and 1,417.5 SF of Filterbed. <br /> =(D —W ———W-- _--4 <br />