Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> REG. PREM. DIESEL <br /> Tank ID (one OPE per column) <br /> Are both vent and tank riser piping r Yes Yes r Yes r Yes <br /> secondarily contained? r^ No r No r No r No <br /> OPE Model oPw OPw OPw <br /> P-1 Shut off I✓ Shut off r Shut off r Shut off <br /> Flow Flow Flow Flow <br /> r Restricts r— Restricts 7 Restricts r Restricts <br /> What is the OPE response when activated? Flow Flow Flow Flow <br /> (Check all that apply) I— Audible r Audible r Audible r Audible <br /> Alarm Alarm Alarm Alarm <br /> r Visual r Visual r Visual 7 Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping r Yes* r Yes* r Yes* r Yes* <br /> that may interfere with the OPE operation? r: No r No r No r No <br /> At what level in the tank is the OPE set to 105 106.75 105 <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at <br /> 94.1 94.9 94.4 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to r. Yes r Yes r Yes r Yes <br /> respond when the stored substance reaches �- No r No r No r No <br /> the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> r. Pass r. Pass Pass r Pass <br /> OPE Inspection Results r, Fail r Fail r Fail r Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> *Mark here if: <br /> r Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations; and In-Tank Setup report(s) <br />