My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 10:47:57 AM
Creation date
3/9/2023 4:17:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY 76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Underground Storage Tank <br />Secondary Containment Testing Report Form <br />All tests marked “Fail” and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 3 of 5 <br />Test Method Developed by ☐ Manufacturer ☐ Industry Standard ☒ Professional Engineer <br />Test Type ☐ Pressure ☐ Vacuum ☒ Hydrostatic <br />Test Equipment Used: Caldwell Level Change Indicator <br /> <br />Sump/UDC ID 1-87-PS 2-91-PS 3-Diesel-PS <br />Sump Manufacturer Western FG Western FG Western FG <br />Sump Depth (inches) 40" 40" 40 1/2" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />13" 16" 17" <br />Test Start Time 9:52 10:35 9:57 <br />Initial Reading .001 .001 .001 <br />Test End Time 10:22 11:05 10:27 <br />Final Reading .001 .001 .001 <br />Change in Reading 0 0 0 <br />Pass/Fail Criteria > .002 > .002 > .002 <br />Tightness Test Results ☒ Pass ☐ Fail ☒ Pass ☐ Fail ☒ Pass ☐ Fail ☐ Pass ☐ Fail <br /> <br />Sump/UDC ID UDC 1&2 UDC 3&4 UDC 5&6 UDC 7&8 <br />Sump Manufacturer Bravo Bravo Bravo Bravo <br />Sump Depth (inches) 9" 9" 9" 9" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />BP BP BP BP <br />Test Start Time 10:02 10:07 10:40 10:43 <br />Initial Reading .001 .001 .001 .001 <br />Test End Time 10:32 10:37 11:10 11:13 <br />Final Reading .001 .001 .001 .001 <br />Change in Reading 0 0 0 0 <br />Pass/Fail Criteria > .002 > .002 > .002 > .002 <br />Tightness Test Results ☒ Pass ☐ Fail ☒ Pass ☐ Fail ☒ Pass ☐ Fail ☒ Pass ☐ Fail <br /> <br />Additional copies of this page may be attached. <br /> <br />8. SUMP/UDC TEST
The URL can be used to link to this page
Your browser does not support the video tag.