Laserfiche WebLink
Designated Underground S <br /> UST operator Visual <br /> rank <br /> TESTING sual Inspection Report <br /> mAND MAINTENgNCE <br /> �s onitoring system certific <br /> Z months? ation been completed Yes No NA Date last <br /> ias spill container testing be pleted within the performed <br /> 12 months? past D <br /> been Completed 3/31/2022 <br /> Has overfillwithin the past <br /> prevention e r'r � <br /> the past 36 months? quipment inspection been 3/31/2022 <br /> Has seconds completed within © 0 <br /> ry containment testing been Completed 3/25/2019 <br /> 36 months? pleted within the past <br /> tank tightness testing been completed 2 <br /> mes? pleted within required /21/2022 <br /> Has line tightness testin <br /> timeframes? g been completed within the required <br /> Other Test/ © � 0 <br /> Maintenance: AQ resting <br /> Other Test/ Maintenance: HMSP cERs update stant <br /> 4/22/2022 <br /> Other Test/ Maintenance: eC 0 0 <br /> TLS-350 PLLD 7 CSLD under continuous teak detection 1/11/2022 <br /> 11. FACILITY EMPLOYEE TRAINING � <br /> Have all individuals pertorming facility employee duties <br /> employee training within the past 12 months? received the required facility Xes No <br /> 13. COMMENTS <br /> This section may be used to recordcomments or observation <br /> deficiencies. s that are not current compliance <br /> Sections VII thru XLL Continuous in tank leak detection me <br /> Alarm history report. *Continuous in tank leak detection & Line TLS-350 PLLD line testing <br /> continuous Line tightness PLLD testing g See <br /> knnual monitor testing performed 3/31/22 up to date <br /> SD VLW 4/6 Hoses Nozzles inspected NFA required <br /> Vorking with testing company regarding Overfill and AQ testi <br /> eturn to compliance reporting in progress ng scheduling <br />