Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer © Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure © Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Vacuum Pump/Vacuum Gauges in Hg. <br /> Tank ID 1-87-Main 2-87-Siphon 3-91 <br /> Tank Manufacturer O C Tank O C Tank O C Tank <br /> Tank Capacity 11,627 Gal 11,627 Gal 11,627 Gal <br /> Test Start Time 11:30 11:40 11:50 <br /> Initial Reading -10" Hg. -10" Hg. -10 Hg. <br /> Test End Time 12:30 12:40 12:50 <br /> Final Reading -10" Hg. -10" Hg. -10" Hg. <br /> Change in Reading 0" Hg. 0" Hg. 0" Hg. <br /> Pass/Fail Criteria No Loss No Loss No Loss <br /> Tightness Test Results ® Pass ❑ Fail I ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br /> Pipe Run ID 1-87-Main 2-87-Siphon 3-91 4-Gas Vapor <br /> Pipe Manufacturer Smith Smith Smith Smith <br /> Test Start Time 11:35 11:37 11:39 11:55 <br /> Initial Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time 12:35 12:37 12:39 12:55 <br /> Final Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Change in Reading 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Pipe Run ID 5-87-Vent-M 6-87-Vent-S 7-91-Vent <br /> Pipe Manufacturer Smith Smith Smith <br /> Test Start Time 11:57 12:01 12:05 <br /> Initial Reading 5 Psi 5 Psi 5 Psi <br /> Test End Time 12:57 1:01 1:05 <br /> Final Reading 5 Psi 5 Psi 5 Psi <br /> Change in Reading 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Criteria No Loss No Loss No Loss <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2of5 <br />