My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 3:48:29 PM
Creation date
3/21/2023 2:17:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Existing OPW 2100-DEVR spill containment <br /> Location of repair work to be repaired and remain <br /> - - - - - - - - - - - - - - - - - - o Point of repair, lower band clamp and integrated <br /> - - - - - - - - - - - - - - - - - - <br /> gasket. <br /> - - - - - - - _= Day Tank Day Tank Remove band clamp, remove HDPE containment <br /> rr <br /> 2 1 tube and gasket. Clean upper contaiment tube and <br /> gasket. Inspect both for debris, wear or damage. <br /> Reassemble spill bucket and hydrostatically test <br /> for leak tightness. <br /> Generator - - - — - <br /> N <br /> W <br /> I I f <br /> O <br /> I I <br /> I I <br /> O Generator 1 <br /> \ Existing OPW overfill valve assembly to remain <br /> Existing USD Leak <br /> Monitor <br /> \ Scope: Notify SJEHD HaZVlat 48hr in advance of performing work on site. <br /> Secure work area, break out and remove existing concrete cover to <br /> expose existing spill containment bucket. Make repair to existing <br /> OPW spill containment bucket, reassemble and hydrostatically test <br /> 0 0 same spill containment bucket. Replace concrete cover around <br /> existing spill containment. Schedule with SJEM to perform <br /> o 0 hydrostatic test of existing spill containment bucket and vacuum test <br /> 0 0 of existing tank annular space. Update ' Spill Container Testing <br /> Report' form. <br /> 0 0 e <br /> U O <br /> s . <br /> O <br /> 0 0 "t3 <br /> LOCATION: DRAWING <br /> LLNLBldg S-1 <br /> 1599 W. <br /> 15999 Corral Hollow Road REV Date <br /> Tracy, CA 95376 1 . 1 2-13-23 <br /> THORNTON ENVIRONMENTAL CONSTRUCTION Origin <br /> P.O. Box 360833 <br /> 1Atilpitas, CA 95036 <br /> PHONE 209 8340792 Scale <br /> 408-946-1015 None <br /> FAX 209-8340795 <br />
The URL can be used to link to this page
Your browser does not support the video tag.